The building, and what it does to the job
On these streets hardly any of it is newly built, so what the old surface was fixed to matters more than what goes on top. Where several kitchens are done together they come off the same slab run, or the batch will not match. Dry-assembled before anything leaves the workshop.
The addition is one room wide, so the run is a galley with a door at one end and a window at the other and no wall long enough for anything else. Old skirting behind the carcasses is checked at worktop height, since that is what decides whether the top can go back tight. What the building will take decides how it is fixed.






