The housing stock
What we are usually working with in Strand-on-the-Green
Ceilings are generous and the rooms are narrow, so the runs are long, the aisle is tight and there is nowhere to stand a slab on edge. All of that is settled at the nesting stage, because a machined piece cannot be adjusted afterwards. The awkward corner is cut first, while the slab is whole.
Because every piece is hand-carried along the towpath, slabs get broken into shorter sections than you would normally accept and the joints get planned around the carry, not the layout. Frontages face a towpath with no vehicle route to the door, so everything is carried from the nearest road, and high tides put flood boards across the way in. The hardest access in the borough.
That rear wall carries the back door and the only window, which leaves very little uninterrupted length for a sink run. The other constraint is the hall: a piece has to come through the front door, round the newel at the foot of the stairs and through a doorway into the back kitchen, so we size the pieces to the tightest turn on that route before we nest anything, which sometimes means splitting a run that would otherwise have gone in whole. Nothing is machined square because a plan says square.
What turns up on the job sheets is 18th century riverside cottage, Georgian terrace and Victorian infill. The age of the shell tells us more than the age of the kitchen does.
Access. The hardest access in the borough.
There is nothing to visit in Strand-on-the-Green. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.