Newham · E15

Worktop replacement in Stratford

Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Capri White island with a brass bridge tap over the sink, the range cooker and lantern pendants beyond, dressed with eucalyptus

Stratford kitchens

The kitchens we meet in Stratford

Nothing about worktop replacement in Stratford is decided by us alone, since the units, the walls and the way you get through the door all get a say. New apartment kitchens dominate and are open-plan against a wall of the living space, 2.6m to 3.2m of run with integrated appliances and a slim breakfast bar; owners replace the developer laminate top for stone within a few years. The older terraces to the west still have back-addition galley kitchens of around 2.4m. None of it needs deciding today. The survey is where the guessing ends and the numbers start.

The side return was an outside toilet and a coal store before it was ever a kitchen, and the walls left over from that are half a brick thick. Old top out in the morning, new stone down and sealed the same afternoon, with a plumber either side of us. An old kitchen has moved, and the stone is cut to that.

Original shutter boxes survive in the reveals of the front rooms and stand proud of the plaster, and that is the line a run under the window has to be scribed to. Each piece is offered up and eased in rather than dropped, because nothing in the room is straight enough to drop into. Old tops were scribed to a wall that has moved since.

The stock we template in here is Victorian terrace, 1960s-70s estate and 2012 onwards high-rise apartment. Which one you have changes the order of the day more than the design does.

Undermounted sink cut-out in a quartz worktop
  • Victorian terrace
  • 1960s-70s estate
  • 2012 onwards high-rise apartment

True everywhere

Worktop replacement, in short

  • The units stay. Only the surface changes.
  • Templating happens in the room, and it is the measurement everything else is cut from.
  • A run longer than a single slab arrives in pieces, with a join between them.
  • Up to four quartz samples are posted free before you commit to a colour.
Borough
Newham
Postcodes
E15
Covered on
our east London run
Fitted
5–10 working days from template

The place

Why Stratford is its own job

Because we work across Stratford rather than one street of it, we know which questions are worth asking up front. Around the centre almost everything is a managed development with basement loading bays, booked goods lifts and marshalled service yards, and events at the nearby venues bring road closures and event-day parking restrictions. The Victorian streets are CPZ-controlled with narrow bays and no forecourt. The recurring job is stripping out a builder-spec top in an occupied new flat, so dust control and a same-day sink swap matter as much as the stone. Our own installers do the fitting, so whoever templated the room is not handing the problem over to a subcontractor.

The work

What worktop replacement involves

Replacement suits a kitchen that works but has a surface past saving, burnt, swollen at the joints, or lifting where water has found its way into the board underneath. Where a carcass end has swollen or a run has dropped, that is put right before the new top goes on, because stone will not correct a surface that is out of true and will not forgive one either. You are left with a kitchen that did not have to be emptied, replanned or lived without, and one new element in a room that otherwise did not change at all.

Replacement sometimes runs in the reverse order to a new fit, because the old top has to come off before what is under it can be templated. The carcasses are read for swelling, soft ends and any fall along the length once the top is off, and that reading is what the day gets costed against. Original cabinets are long gone here, and what comes out is a flat-pack run that has spent fifteen years on a cold solid floor. Support goes in before the weight does.

Sink cut-outs See the options

The money

What it costs in Stratford

The saving on a replacement is that you keep the units. The risk is what is found under the old top, and that is checked before a deposit rather than after. In a galley the runs are short and the cut-outs are close together, so the fixed operations carry more of the total than the stone does. Two quotes can agree on a supply rate of £110 to £550 per square metre and still land a long way apart, because the cut-outs, the joins and the edge profile are priced after it. What is found underneath is raised before it is charged.

Victorian and Edwardian terraces

Stratford in the housing figures

Around here most homes are rented rather than owned. On a room that size the cut-outs cost more than the area. The whole job is one day by design, because an empty kitchen is not earning. Carcasses checked before anything is ordered.

Victorian and Edwardian terraces

What Stratford asks for

Replacing one plot years after handover is the problem nobody plans for, because a quartz colour can be reordered and a granite block cannot. Where the doors and drawer fronts are staying, the new surface is chosen against them rather than in isolation. A void week is the entire schedule.

On the job sheets for this area, this is the line that keeps repeating, above worktop installation and worktop splashbacks & upstands.

Access

Getting stone into a Stratford kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

East London patch

Stratford is covered on our east London run, along with the rest of Newham.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Stratford

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Which postcodes do you cover around Stratford?

Yes. Stratford is on the patch, and the postcodes we work here are E15. It is worked on our east London run, along with the rest of Newham. An event-day suspension can override a bay that is perfectly usable the rest of the week, so a booked space gets checked again nearer the time. A replacement is a two-way job, with old tops going out and new stone coming in, so the van needs to stay put across the whole day. Half a day of parking buys half a job. We come to the kitchen to template and again to fit, so there is nothing to visit and nothing to collect.

02

What should I expect from worktop replacement in a Stratford kitchen?

Where the kitchen has taken the bay, the end of the room is three facets of glass set at angles and there is no straight wall left to finish against. In most Victorian terraces the kitchen sits in the back addition, so you get a narrow galley with one outside wall and nothing square to work off. What the last fitter did to the wall shows up on strip-out. Two walls each a degree out give an internal corner two degrees out, and the whole of that error lands in the mitre. The old top has been hiding it, so the first honest look at it happens when the laminate comes off. What is behind the old top decides the day.

03

How would you get a worktop into a property in Stratford?

Blankets on the walls and a board on the floor go in before the first piece, because a scratched car becomes a bill from the managing agent long after the kitchen is finished. With no room to turn, the old top gets cut up in the kitchen instead, which is dusty work and needs the room emptied first. It sets what the day actually looks like. Where a road is shut for filming or for works the diversion adds distance to the carry even when parking itself was never the problem. Waste is the part people forget: the old laminate or tired granite has to be walked back to the van and it does not get lighter. The carry happens twice here, so the distance counts twice.

04

Is worktop replacement what Stratford rings about?

Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop installation and worktop splashbacks & upstands. New-build kitchens are usually smaller than the plan suggests once the appliances are in, so the usable run is shorter than the drawn run. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. A plumber either side of us. Buyers upgrading before handover work to a choices deadline set by the sales office rather than by the build programme. The carcasses have to be sound, because stone is several times the weight of what is coming off. The fastest upgrade a sound kitchen has.

05

What moves the number on a quote around here?

The two runs are rarely the same length, and the shorter one often carries the sink, which puts the cut-outs in the piece with the least material to spare. The existing layout is being kept, so the question is whether the old carcasses will take stone in that shape without more support. Laminate hides what the gables are really doing. The supply-only figure for material runs £110 to £550 per square metre, and templating, fabrication and fitting are lines of their own.

06

What state does a Stratford kitchen have to be in before you template?

A scribe has a working limit, and past twenty millimetres or so the back edge starts eating depth the run cannot spare. This is the commonest reason a replacement turns out to need more than a straight swap. The beading was covering a bowed wall. Have a plumber booked to disconnect the sink, tap and waste first thing and reconnect after we have gone, and clear the hallway and stairs completely so we can carry slabs through the house. Where someone is living in the house through the work, the strip-out and the fit are planned so the kitchen is out of use for a day and not a week. If the carcasses are tired the honest answer is that stone will find that out, and it is better said before than after. Wear is what the next inventory records.

07

Do most Stratford kitchens take upstands or full-height splashbacks?

Upstand or splashback, the stone is cut from the same slab run as the worktop, at the same time, so the batch actually matches. What decides between them is usually the wall: what it is built of, how flat it is, and where the sockets ended up. It is quoted by area like the worktop, so a long run is a material line rather than a trim. Cornice runs round the head of the wall, so the wall units stop under it and the splashback band is trapped between two things that are not going to move. Lath-and-plaster and bowed brickwork mean we template for scribes rather than straight cuts, and each piece is offered up and eased in rather than dropped straight down. The units have settled with the floor and get re-levelled.

08

What is actually on a Stratford worktop quote?

The design and quotation visit is free and carries no obligation, so a figure exists before any commitment. Material is quoted supply only and templating, fabrication and fitting sit on their own lines, so it is visible which part is stone and which is labour. No installed price per square metre is published, because it is not a real number. Walls that bow along their length are the normal condition rather than the exception, and a straight-cut back edge will show a shadow gap at one end and touch at the other. We would rather find it at template than on the morning, which is why the templater looks behind the units. Strip out first, then measure what is actually there.

09

Will you fit stone onto units that are not level?

A long top on units that were shimmed once and never checked is the commonest version of this, and it is cheap to fix beforehand. Units have to be fitted, fixed and level before templating, and it is better to hear that at the template than on the fitting day. A run can measure dead right at both ends and still belly out in the middle, which only appears once the template plots the intermediate points. It usually explains the odd filler piece or strip of beading in the existing run that nobody could account for. The old carcasses are rarely level and never were.

10

Can the sink be undermounted rather than sat on top?

If the sink or hob changes after the template, the drawing changes first and nothing is cut meanwhile. Each cut-out is priced on its own line, so a range, a bowl and a half, a boiling tap and a drainer are four items rather than one. A sit-on sink and an undermounted one are different cut-outs, so which it is gets settled before the template. A tall bank of housings at one end takes a chunk out of the working run, so the usable length of that side is always less than the length of the wall behind it. Old laminate has often been holding a run square for years, and taking it off shows what the units were really doing. A corner that was butted can be mitred this time.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Really impressed with the quality and finish of these worktops. Great range of materials, precise fabrication, and smooth communication throughout. The whole process was easy and the final result looks fantastic. Highly recommend!”
Nastasia DragoGoogle review
★★★★★
“We installed new kitchen and got the worktop and splash back from them. Their professional work and commitment was wonderful. Quality of work compared to price was way too good. Thank you guys.”
MD Matinur RahmanGoogle review
★★★★★
“I am really happy with my worktop. It is beautiful and the service provided was second to none. I totally recommend.”
Magaly RGoogle review

Next step

Worktop replacement in Stratford, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.