Getting stone into the room
Most houses have a side alley shared with the neighbour, gated at the front.
Where a loading concession applies at all, it holds only while something is being carried, which makes it a way to unload rather than a way to park. A replacement is a two-way job, with old tops going out and new stone coming in, so the van needs to stay put across the whole day. Old stone is heavier going out than it looked coming in.
The building, and what it does to the job
Around here almost no homes fall in the upper council tax bands. No two kitchens are set out alike. The sink and hob are seated and sealed before we leave; we do not connect water, waste, gas or electrics. Adhesive is the last step, never the first.
The boiler has usually been moved out of the main house into the addition, and its flue, its pipework and its condensate all cross the wall the run wants. What the old top has been hiding is usually a floor that settled towards the back and units that were never fixed back to the wall. Old tops were scribed to a wall that has moved since.
Flat-roof rear extensions here often have a shallow lintel over the garden doors, so we check the head height before planning a tall bank at the end of the run.
What the housing here calls for
An open-plan extension puts the worktop in the middle of the living space, so it is looked at from the sofa as well as worked on. The fitting day is scheduled to suit that rather than to suit the diary. That family has lived on a building site long enough.