The housing stock
What we are usually working with in Worcester Park
The rear extension is usually the newest and truest part of the building, so it is the older half of the kitchen that gives the trouble. Protection down, dry-lay, scribe, then bond: the order matters more in a difficult room than an easy one. The room is swept and the offcuts leave with us.
The larder had a cold shelf and an air brick straight through to the outside, and that brick is usually still open behind whatever now stands in front of it. The side route is boarded where it crosses a soft path or a border, and the gate is measured rather than assumed. Levelled first, then set, then sealed.
The buildings themselves are mostly 1930s semi, 1930s detached, post-war detached and 2000s apartment development. The join count is decided by which of those the room sits in.
Access. Residential roads with driveways and side gates, so access is good, but the station approach and the roads around the parade are congested at school and commuter times.
There is nothing to visit in Worcester Park. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.