Getting stone into the room
Dense terraced streets with permit parking throughout, plus large new developments with underground loading, security sign-in and booked lifts. The A40 feeds the area from the north.
Time-limited bays are camera-enforced across a lot of managed estates, so the unload runs to the clock and the van moves off afterwards. Two loads share the one space here, the old tops waiting to go and the new stone waiting to come in. Old stone is heavier going out than it looked coming in.
What the housing here calls for
Where ownership is split across a building, the common parts belong to someone else and the carry route is negotiated rather than assumed. Changing an appliance after the nest is set means recutting the piece, not adjusting it. Remakes for our error are ours to carry.
The building, and what it does to the job
In this corner of the borough, the stock leans newer than the London norm. The sink and hob are seated and sealed before we leave; we do not connect water, waste, gas or electrics. Nothing is left for the next trade to finish.
The rear door swings inward across the end of the run, so the last few hundred millimetres of worktop are only reachable with the door shut. The units are levelled and packed before a top goes near them, because a settled floor shows immediately in a long straight edge. Levelled first, then set, then sealed.
Acton is heavy on houses in multiple occupation, so one building can hold four or five small kitchens, and they are best batched off the same slab to match.