The housing stock
What we are usually working with in Barnes Cray
Painted brick is flat nowhere, and raked-back mortar joints leave a line no straightedge agrees with. The units stay and only the surface changes, so the job is a day, and what makes it a difficult day is the building. How old the kitchen is decides how long preparation takes.
Flat riverside ground with wide but frequently blocked estate roads and industrial traffic; parking is on-street and generally available.
The goods lift is generous and the flat entrance often is not, so the tightest point on the route is inside the flat rather than in the building. Where brickwork bows enough that a full-depth piece cannot go back tight, the units move forward and the front overhang changes. Off in the morning, on by the afternoon.
The stock we template in here is 1920s-30s industrial estate housing, postwar terrace and 1960s flats. The one you have sets the piece length before the kitchen does.
There is nothing to visit in Barnes Cray. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.