The housing stock
What we are usually working with in Chiswick
A hundred and forty years of alterations sit under the current kitchen, and the worktop is what has to sit flat on top of all of it. Levelling is done under the units and not under the stone, so anything out is corrected before a piece is lifted in. Every unit gets a level on it before a piece lands.
Loading needs a suspension or an early slot. Controlled parking on effectively every street, no driveways on the terraces, and the final approach is 20mph residential roads off the A4 or A316 with school-run congestion morning and afternoon. Nearly every job here has an island longer than a standard slab, so where the joint lands gets argued out at template rather than left to the workshop.
The addition wall is half a brick thick in places and has usually had a damp course injected and been re-plastered, which leaves it neither flat nor consistent. We measure the front door, the hall width and the turn into the kitchen before anything comes off the van, because a 3m piece has to swing through that corner on edge and stone does not bend to help you. The house sets the order of work.
The housing behind these kitchens is Victorian terrace, Edwardian villa, 1930s mansion block and 2010s riverside apartment. They are not interchangeable, and a worktop finds the differences quickly.
Access. Loading needs a suspension or an early slot.
There is nothing to visit in Chiswick. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.