The housing stock
What we are usually working with in Corbets Tey
Retrofitted underfloor heating goes into the new part of the floor and stops at the old part, so the build-up changes partway across the room. Pieces come in the order they go down, because there is rarely anywhere to stand the second one while the first is bedded. Levelled under the units first.
The lanes here are tight for a long wheelbase, so we scout the turning point in advance rather than getting a loaded van stuck on a verge. Narrow lanes with limited passing places but very generous private drives, so the difficulty is manoeuvring a long van in rather than finding somewhere to stop.
The floor is often flags or brick laid straight on the ground, so it is solid, uneven and not going to be levelled by chasing into it. A range stays where it is and the flanking pieces are eased in around it, since moving it is rarely part of the day. A structure this old is worked with, not corrected.
The stock we template in here is older village cottage, inter-war detached, post-war detached and large modern house. Which one you have changes the order of the day more than the design does.
There is nothing to visit in Corbets Tey. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.