Havering · RM14

Worktops in Cranham

The surface itself: which stone, what it costs by the square metre, and what the room does to that number.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Alaska peninsula with four grey velvet stools tucked under the overhang, looking through to the utility run

Cranham kitchens

The kitchens we meet in Cranham

Most of the questions we get about worktop jobs in Cranham are really questions about the kitchen itself, which is where any sensible answer has to start. Later suburban stock on the eastern edge, mostly detached houses and bungalows built from the 1950s onwards, so kitchens are already reasonably sized square rooms and rarely need structural work. The common job is a full refit within the existing shape, new units, a U-run with a peninsula, and quartz that has to work with an existing tiled floor the client is keeping. None of that has to be decided before you get a price. It is what the survey is for.

Doorways are 762mm at best, and the turn from the hall into the kitchen is the pinch point rather than the front door. Colour behaves differently in a room like that, which is why a sample sits on the units for a week and gets judged under the lights that will be on when somebody is cooking. Pick the surface for the cooking rather than for the photograph.

Base units from the seventies and eighties are often only 500mm deep, so a 600mm stone top overhangs at the front and the doors want checking against it. These kitchens are small and roughly square, so the run is short, the join count is low and the material band accounts for almost all of the figure rather than the bench time. Short pieces are the argument for buying a slab outright.

On these streets the housing is 1950s-1970s detached, post-war semi, bungalow and 1980s estate house. Each of those puts the services somewhere else, and the cut-outs follow.

Polished stone edge profile close up
  • 1950s-1970s detached
  • post-war semi
  • bungalow
  • 1980s estate house

True everywhere

Worktops, in short

  • Supply is £110 to £550 per square metre across the 181 surfaces we fit.
  • Fitting happens five to ten working days after the template is taken.
  • Quartz is engineered, so its pattern repeats and a long kitchen matches itself end to end.
  • Granite comes out of the ground porous, which is why it gets sealed.
Borough
Havering
Postcodes
RM14
Covered on
our east London run
Fitted
5–10 working days from template

The place

Why Cranham is its own job

Before we quote a length in Cranham we want to know how the stone gets in and what it will be sitting against. Very easy: wide estate roads, individual drives, garages, turning space and no parking restrictions to speak of. Existing floors are usually staying here, so we protect them properly and check base-unit heights against the finished floor rather than the slab. The itemised quote is deliberately boring reading, because a boring quote is one with no surprises left in it.

The work

What worktops involves

The stone is quoted per square metre for supply and itemised beyond that, so the slab, the edge profile, the openings and the fitting each appear as their own figure. Fitting follows the template by five to ten working days, and the pieces arrive finished, with joins bonded in a resin mixed to the colour of the slab. You keep the offcut if you want it, which is where the chopping board, the shelf and the spare piece for a future repair come from.

Picking a worktop is mostly elimination. The cooking rules out one material, the daylight rules out half the colours, and the lengths of the runs finish the job. Slabs are calibrated to a nominal gauge, so a nominal twenty is seldom exactly twenty, and the tolerance is taken up at the joint rather than argued over. Coming off a thick laminate top, twenty millimetres reads closer to the old surface than thirty does against the tiling and the window board. The slab is quoted; the cut list is what you pay.

Edge profiles See the options

The money

What it costs in Cranham

A worktop is priced from the cut list rather than the floor area, because the slab is bought whole and the run lengths decide how much of it ends up on your units. The middle run is usually the one that dictates the slab, and the two wings are worked around it. That £110 to £550 per square metre buys the slab and nothing else. Templating, machining, edges, cut-outs and the fitting day are counted and charged one by one. Nothing about the stone is folded into a rate and hidden there.

period detached houses and villas

The shape of the run

With three walls in play the chance of one of them being out of square is high, and the template has to carry all three angles. Two runs in view at once want taking from the same area of the same slab, because adjacent stone matches and stone from either end of a batch quietly does not. The shape sets the cut list and the cut list sets the stone bill.

period detached houses and villas

What Cranham asks for

Not typical work for this area. Worktop installation and worktop replacement are what the housing asks for. The process is unchanged; only how often we are on the street differs.

period detached houses and villas

Cranham in the housing figures

Around Cranham, the great majority of what is standing is post-war, on planned estate layouts. People here are specifying once, for a decade. Smaller homes with north facing kitchens absorb light rather than throw it back, which is why gloss level does more there than any name on a swatch. Serious daily cooking narrows the sensible choices to a handful of materials.

Access

Getting stone into a Cranham kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

East London patch

Cranham is covered on our east London run, along with the rest of Havering.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Cranham

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Are you set up to work in Cranham, or is it a subcontractor?

Yes. Cranham is on the patch, and the postcodes we work here are RM14. It is worked on our east London run, along with the rest of Havering. A visitor or a neighbour parked on the drive is a five-minute problem at eight in the morning and an hour-long one at eleven. Whatever the standing allows, the stone leaves that van finished, because every edge, cut-out and internal radius is machined at the works and none of it is open to reconsideration at the kerb. A figured slab takes longer to match than a plain one. Nothing needs visiting and nothing needs collecting: the template is in your kitchen and so is the fit.

02

Is there anything about Cranham buildings that catches worktops out?

The kitchen is at the front or the back depending on the plan, and which it is decides whether there is a rear door on the route at all. Coming off a thick laminate top changes the front edge, and twenty millimetres reads closer to what the room is used to than thirty does against existing tiling and a window board. A tall room carries a thick edge; a low one does not. Legs bottoming out on hard concrete or an uneven screed mean the tops of the carcasses are not one plane, and that is picked up at template rather than on fitting day. Every notch and every scribe is machined into the piece before it leaves the works, and a hard sintered surface is the least forgiving of a tight internal corner, so one is always cut with a generous radius. Heat at the lip of an opening is the slow kind of damage.

03

What do you check about the route into a Cranham property?

The tail lift is still the pinch point, because the piece has to be walked off it onto the trolley while it is sitting at chest height. That caps the longest piece, and a run split into two lengths nests differently on the slab, which moves the yield and moves the figure with it. What will not travel whole is designed to break somewhere sensible. Where the front garden has been paved over completely the van stands close to the house, and the route in is still a standard front door. A granite kitchen ends its day with a sealer, and a sealer wants a dry face and a quiet hour afterwards, so that hour is written into the day rather than borrowed from it. Stone is delivered machined, sealed and covered, in that order.

04

Does Cranham actually ask for worktops?

Not to any real extent, and it would be easy to imply it was. What the research on this patch actually lists is worktop installation and worktop replacement. It describes the kitchens on this patch, not the work that goes into them. Same quoting, same cutting, same fitting as anywhere else on the patch. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. Where several kitchens are ordered together the sensible move is to take them all off one batch, because two slabs of the same name bought six months apart will not sit happily in the same building. Colour names outlive their batches by several years. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. Volume work tends to live at the entry end of the range, and the entry end is genuine stone rather than a compromise, since the lowest supply figure we quote is a sintered surface and not a thin laminate pretending to be one. Fitting follows template by five to ten working days.

05

Why do two Cranham kitchens the same size price differently?

The advantage of a U is that every join can be put over a gable in a corner, so nothing lands in the middle of a clear length. A shape like that nests kindly on a slab, so more of what gets bought ends up on the units and the rate per square metre behaves much as the brochure says it will. Yield is a property of the room as much as of the slab. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

06

What has to be finished before you can template?

Level has to hold across the whole room rather than along one wall, or a floor that falls end to end shows as a step where two pieces meet. A run that sits under strong sun for hours every afternoon suits a surface built to be stable in daylight, because a resin-bound stone is made for indoor use and sustained sunlight is the one thing it was never designed around. The obstruction is templated as found and cut as templated. Measure the run between the walls, note the cill height above the units, and tell us the thickness of the top that is coming off. Someone who expects to still be there in ten years asks different questions: how a honed finish marks, what a sealer does and does not do, and whether a chip by the sink can be repaired in place. That changes which questions are worth asking about the stone, because somebody staying put wants to know how a honed face marks in five years and somebody selling wants to know how it photographs next spring. Staying put and selling on ask different questions of a stone.

07

How many visits does a Cranham worktop take?

The template is taken in your kitchen after the units are in and fixed, never before. Upstands and splashbacks are templated after the worktop is down and settled, so they are a separate visit. The same firm templates and fits. Nobody else is brought in to install. Plaster over blockwork is thin and hollow in patches, so anything fixed back to the wall needs a sound spot found first. Which stone belongs on top of all that is a separate question from the building itself, and it is the one with a figure attached, because supply alone runs from £110 to £550 per square metre before a single cut has been made. The light in a room shortens the shortlist faster than the budget does.

08

What if a worktop will not physically fit through the building?

Splitting a run costs a join, and that is the price of getting stone into the room at all. If a piece cannot be got in at all, we say so at the template rather than on the day. A join forced by the route still sits over a gable, so it is no poorer a join for that. Suction lifters need a clean dry face to hold, so in the wet the pads come off and the piece goes back to being carried on webbing by hand. Where a seam becomes unavoidable the choice of stone starts to matter, because a fine even speckle closes a joint almost invisibly and a broad vein simply will not. The protective film peels off last so the finish is untouched.

09

Is a full-height stone splashback worth doing?

If it is a decision for later, say so at the template: the match is a question about the batch. The joint between splashback and worktop is siliconed, never grouted, so it can move a little without cracking. Tiling and stone can meet, but where they meet is decided before the template rather than after. These were built on a solid ground floor slab, so nothing bounces and nothing can be packed down, only up. Kitchens in this stock are small and roughly square, so the run is short, the seam count is low, and almost all of the figure is material band rather than bench time. Honed hides the dust an older house makes all year.

10

Do you cut drainer grooves on Cranham kitchens?

They are cut with a fall towards the bowl, which is why they cannot be added on site later. Grooves are machined into the surface rather than applied to it, so there is nothing to come loose later. The bowl position has to be settled before templating, since the grooves are set out from it. Small, roughly square kitchens with a back door and a window in the middle of the run: short lengths, few joins, and a lot to work around. The surface is where the money actually moves: across the 181 surfaces we list the median is £220 per square metre, and half of them sit between £165 and £300. The cheapest stone and the dearest one share a fitting day.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“We installed new kitchen and got the worktop and splash back from them. Their professional work and commitment was wonderful. Quality of work compared to price was way too good. Thank you guys.”
MD Matinur RahmanGoogle review
★★★★★
“I am really happy with my worktop. It is beautiful and the service provided was second to none. I totally recommend.”
Magaly RGoogle review
★★★★★
“We recently had a Calacatta Gold worktop installed by Worktop Worx and are really pleased with the result. It has completely transformed our kitchen, much brighter, modern, and high-end compared to our old wooden surface. The team were professional, efficient, and the finish is excellent with great attention to detail. The worktop looks amazing and is very practical for everyday use. Highly recommend Worktop Worx for anyone looking for quality quartz worktops.”
RO74 TVXGoogle review · Calacatta Gold

Next step

Worktops in Cranham, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.