Havering · RM14

Kitchen worktops in Cranham

Later suburban stock on the eastern edge, mostly detached houses and bungalows built from the 1950s onwards, so kitchens are already reasonably sized square rooms and rarely need structural work. The common job is a full refit within the existing shape, new units, a U-run with a peninsula, and quartz that has to work with an existing tiled floor the client is keeping.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Arctic Starburst carried round a U-shaped kitchen in pale grey handleless units, pendants over the breakfast bar

The housing stock

What we are usually working with in Cranham

Units are often only 500mm deep, so a standard 600mm stone top overhangs at the front and the doors need checking against it. Carcasses that carried laminate for two decades are worth checking, and often bracing, before they carry stone. The old top comes off in pieces, not whole.

Very easy: wide estate roads, individual drives, garages, turning space and no parking restrictions to speak of. Existing floors are usually staying here, so we protect them properly and check base-unit heights against the finished floor rather than the slab.

These were built on a solid ground floor slab, so nothing bounces and nothing can be packed down, only up. A deeper top on shallow units overhangs at the front, so the doors and drawer fronts are checked before it is bedded. Old fixings come out of soft brick and better ones go in.

Locally the mix runs to 1950s-1970s detached, post-war semi, bungalow and 1980s estate house. Each of those behaves differently once the old top comes off.

There is nothing to visit in Cranham. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.

Borough
Havering
Postcodes
RM14
Covered on
our east London run
Lead time
5–10 working days from template

Get a fixed quote Free samples

  • 1950s-1970s detached
  • post-war semi
  • bungalow
  • 1980s estate house

Havering

Cranham in the housing figures

Around Cranham, the bulk of the housing belongs to the rebuilding decades after the war. People here are specifying once, for a decade. The slow part is the scribe, and it is slow for a reason. The room decides the order of work.

The building, and what it does to the job

The original room is timber over a ventilated void and the newer half is a slab, so the floor gives underfoot on one side of the junction and not on the other. The recess is measured again once the old top is out, since the original fit was often cut to whatever it found. Everything the last fit ignored is visible for a morning.

Getting stone into the room

A shared drive is only useful if the neighbour is not the one parked behind the van, so we ask which side the standing belongs to before the date is set. Two loads share the one space here, the old tops waiting to go and the new stone waiting to come in. A skip on the frontage takes the space the van needed.

Waterfall ends See the options

Nearby

We also work around Cranham

Cranham is one of 27 places we cover in Havering. Worktops across Havering

The whole Essex patch

Questions

Working in Cranham

01

Do you come out to Cranham for a worktop?

Yes. Later suburban stock on the eastern edge, mostly detached houses and bungalows built from the 1950s onwards, so kitchens are already reasonably sized square rooms and rarely need structural work. The common job is a full refit within the existing shape, new units, a U-run with a peninsula, and quartz that has to work with an existing tiled floor the client is keeping. Drives with a dropped kerb and a tight turn-in take a long van at an angle, and that angle decides which side the tail lift can work from. A replacement is a two-way job, with old tops going out and new stone coming in, so the van needs to stay put across the whole day. The waste leaves with us, so the van has to still be there.

02

What kind of kitchens do you usually work on in Cranham?

1950s-1970s detached, post-war semi, bungalow and 1980s estate house. A boiler in a cupboard on the kitchen wall is normal in this stock, and its position is fixed by its flue. Post-war terraces have small, roughly square kitchens with a back door and a window in the middle of the run, so runs are short and joins are rare, but there are usually two corners and a window cill to work around in a couple of metres. The shell is the constant here; the surface is not.

03

How hard is it to get stone into a Cranham kitchen?

Very easy: wide estate roads, individual drives, garages, turning space and no parking restrictions to speak of. A loading bay or a red route puts a clock on the unload, so the pieces come off in the order they will be fitted rather than the order they were loaded. The fitting day is planned backwards from that point, before anything comes off the van. Every re-grip is a chance to chip a piece, so they are planned out.

04

What do Cranham customers usually want done?

Worktop installation and worktop replacement, in that order. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. Where the window is fixed there is no second day to fall back on, so the prep list matters more than usual. The building keeps working around us. Existing floors are usually staying here, so we protect them properly and check base-unit heights against the finished floor rather than the slab.

05

What makes one Cranham kitchen cost more than another?

The two returns in a U are close to the same size and it is tempting to nest them side by side, except that the veining then mirrors across the room and reads as deliberate for the wrong reason. The existing layout is being kept, so the question is whether the old carcasses will take stone in that shape without more support. Carcasses have to be sound first. Legs bottoming out on hard concrete or an uneven screed mean the tops of the carcasses are not one plane, and that is picked up at template rather than on fitting day. On the day it means dry-laying, marking, and cutting the scribe on site before anything is bonded. Two millimetres at the wall is two millimetres you see. Material starts at £110 per square metre supply only, and templating, fabrication and fitting sit on their own lines rather than inside one figure.

06

Are Cranham flats a problem for you?

An owner living in the house makes the decisions and lives with them, so the specification tends to go towards the material rather than towards the lowest total. The fitting day is arranged with whoever can actually give us access for the whole slot. The whole slot, or the stone waits. Let us know the building when you book, and the lift, the stair turn and any freeholder notice are handled beforehand rather than on the fitting day.

07

What if a worktop will not physically fit through the building?

Where there is a lift, whether it can be booked out and padded matters as much as its size. Doorways, the newel post and the handrail usually take the room away, rather than the stairs themselves. Splitting a run costs a join, and that is the price of getting stone into the room at all. The van gets close to the door and the stone comes off the tail lift onto a trolley, which is about the shortest carry we ever get. Finding it out on the morning costs the whole slot, because there is no second route to fall back on. Someone stays on the trailing end the whole way in.

08

Can I have grooves instead of a separate drainer in Cranham?

On a porous stone the grooved area is sealed with the rest, and it gets wet more than anything else. A groove set needs a clear stretch of worktop beside the bowl, so it competes with the run for length instead of being free surface. A stub wall divides the kitchen from the back lobby, and it rarely stayed where the original drawing put it. The units stay and only the surface changes, so the job is a day, and what makes it a difficult day is the building. Laminate hides a level that stone will not.

09

Is templating a separate visit from fitting?

The template produces a drawing, and the workshop cuts to that drawing once you agree it. Nothing changes hands until after the template. A template on a normal kitchen takes two to three hours in the room. A boiler hangs on the wall above the run in most of these, and its pipework drops exactly where a splashback wants to go. Taking the old tops off is also the first honest look at what has been going on underneath them. Chipboard carcasses get bracing before stone lands on them.

10

Upstands or a full-height splashback?

What decides between them is usually the wall: what it is built of, how flat it is, and where the sockets ended up. An upstand is a slim strip that follows the worktop up the wall; a full-height splashback runs from the worktop to the underside of the wall units. Ordered later from a different batch, the match is not reliable where the two pieces meet. Ceiling heights dropped after the war, so there is less wall between the worktop and the wall units than in anything older. The units are often 1970s or 80s and only around 500mm deep, so a standard 600mm stone top overhangs at the front and the doors and drawer fronts need checking against it. Nothing goes back on carcasses the building has pulled out of square.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Karim is excellent, he did superb job with Templeting and fitting my kitchen, highly recommend”
M SgGoogle review
★★★★★
“I am really happy with the work! He fitted my kitchen granite worktop really nicely and got the job done on time, just as promised. He was friendly, professional, and made sure everything was done the way I wanted. Would definitely recommend Karam to anyone looking for a great job!”
esther boaduGoogle review · granite
★★★★★
“Nice work from worktop worx. Highly recommended”
Rasika KumarageGoogle review

Next step

Get your Cranham kitchen priced

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.