The building, and what it does to the job
In this neighbourhood almost no homes fall in the upper council tax bands. The rooms therefore start closer to true than in most of London. The sink and hob are seated and sealed before we leave; we do not connect water, waste, gas or electrics. Sealed and wiped down the same afternoon.
Side extensions widen the room enough for an island, but the existing ceiling joists were not sized for a downdraught extractor run, so we check before a hob cut-out is committed.
A wall line that runs level over a floor that does not means the finish closes up on the plinth at one end, which is joinery rather than something the stone can answer. Sealant is not a way of fitting it, so the scribe is cut until it closes and the silicone only has to seal. The alcove piece is dry-laid before the run is.







