Enfield · N14

Kitchen worktops in Oakwood

Deep rear gardens backing onto the Trent Park side means big single-storey rear extensions with a glazed roof, so the kitchen becomes a proper open-plan room with a 3m-plus island facing the garden and the working run pushed back against the old rear wall.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Alaska peninsula with four grey velvet stools tucked under the overhang, looking through to the utility run

The housing stock

What we are usually working with in Oakwood

The scullery and the kitchen were knocked into one at some point, and the stub of the old dividing wall is still there under the plaster. Protection down, dry-lay, scribe, then bond: the order matters more in a difficult room than an easy one. Suction pads will not hold on a wet or dusty face.

Houses at the later end of this period went up in cavity rather than solid brick, so two that look identical from the road behave differently when a fixing goes in. The carry is the easy part; the plaster around the old breast and the packing over a moved floor are not. The slow parts are slow for a reason.

The kitchens we see here sit in 1930s semi, 1930s detached and 1960s bungalow. None of them is harder than the others; they are awkward in different ways.

Access. Good - most houses have a driveway and the roads are wide, but the extensions themselves are often already built with the doors on, so the slab route is through the house rather than in from the garden.

There is nothing to visit in Oakwood. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.

Borough
Enfield
Postcodes
N14
Covered on
our north London run
Lead time
5–10 working days from template

Get a fixed quote Free samples

  • 1930s semi
  • 1930s detached
  • 1960s bungalow

Enfield

Getting stone into the room

Oakwood in the housing figures

On these streets very little is recent build, so nearly every job is a replacement into units that are already there. The sink and hob are seated and sealed before we leave; we do not connect water, waste, gas or electrics. Levelled, bonded and sealed in one visit.

The building, and what it does to the job

Where the extension has a large rooflight, the island reads far brighter than a showroom does - judge a dark colour on site rather than under showroom light.

Casement handles and stays swing down into the space above the worktop, so the clearance that counts is the one measured with the window open. It adds an hour or two to the day, and that time sits in the schedule rather than being taken out of the finishing. A scribe is a cut. It is not an adjustment.

Sink cut-outs See the options

Nearby

We also work around Oakwood

Oakwood is one of 22 places we cover in Enfield. Everything in Enfield

The whole Watford patch

Questions

Working in Oakwood

01

Do you come out to Oakwood for a worktop?

Yes. Deep rear gardens backing onto the Trent Park side means big single-storey rear extensions with a glazed roof, so the kitchen becomes a proper open-plan room with a 3m-plus island facing the garden and the working run pushed back against the old rear wall. A shared drive is only useful if the neighbour is not the one parked behind the van, so we ask which side the standing belongs to before the date is set. A van that has to move mid-fit costs the best part of an hour and takes a man off the tools to do it. Van to door is the distance that matters.

02

What kind of kitchens do you usually work on in Oakwood?

1930s semi, 1930s detached and 1960s bungalow. There is a chimney breast on each flank wall, and the one in the kitchen carried a boiler flue rather than a fireplace, so the recess beside it is shallow. The fitting itself is slower than the carry: original plaster on the party wall and around the old chimney breast is rarely square to the run, so back scribes get cut on site, and where a return wraps into a breast recess we template that shoulder tight and ease it in. Levelled first, then set, then sealed.

03

How hard is it to get stone into an Oakwood kitchen?

Good - most houses have a driveway and the roads are wide, but the extensions themselves are often already built with the doors on, so the slab route is through the house rather than in from the garden. A step up to a patio or a raised threshold at the back door means the piece is lifted rather than rolled, and that is where the crew size gets decided. The fitting day is planned backwards from that point, before anything comes off the van. The way in is walked with a tape before the van is opened.

04

What do Oakwood customers usually want done?

Worktop installation, in that order. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. The fitting day is scheduled to suit that rather than to suit the diary. Handover day is a hard stop. Where the extension has a large rooflight, the island reads far brighter than a showroom does - judge a dark colour on site rather than under showroom light.

05

What makes one Oakwood kitchen cost more than another?

Power and waste come up through the floor, and where they surface decides which cabinet can hold a sink and which one cannot. A layout that has been packed and levelled run by run instead of to one datum shows as a step where two pieces meet. Nothing is cut on site if the bench can do it. A low sill over the sink run is what decides between an upstand and stone dying into a window board, and there is often less clearance than an upstand is tall. On the day it means dry-laying, marking, and cutting the scribe on site before anything is bonded. The last hundred millimetres decide how it reads. Material is quoted supply only from £110 per square metre, and templating, fabrication and fitting are given their own lines rather than one combined figure.

06

Are Oakwood flats a problem for you?

Owner-occupied kitchens are usually being done once, which is why the edge profile, the vein direction and where a join falls are worth the conversation. The fitting day is arranged with whoever can actually give us access for the whole slot. A day out of use, told to whoever lives there. Tell us what the building is when you book, and the lift, the stair turn and any freeholder notice are planned in rather than discovered.

07

What is the order of events on an Oakwood kitchen?

Templating and fitting are two visits, not one, and the gap between them is when the stone is actually cut. The same firm templates and fits. Nobody else is brought in to install. Upstands and splashbacks are templated after the worktop is down and settled, so they are a separate visit. Internal walls are hollow clay block or stud rather than solid brick, so two points a metre apart on the same wall want two different fixings. The fitting day is planned backwards from all of it, before the first piece comes off the van. Nothing is cut in the room if the shop could do it.

08

Is one material less trouble than another for an Oakwood kitchen?

Sealing is the one maintenance job that genuinely differs by material, and it is worth knowing which you are buying before the slab is chosen. The bead where the sink and hob meet the stone is siliconed rather than sealed, and wants watching. The original floor is timber over a deep ventilated void with air bricks right round the perimeter, and the extension slab butts straight up against it. A run crossing from the original room into the extension is packed to one plane before the stone is offered up. Carried once, and carried properly.

09

What happens to the worktop that comes off?

An old stone top is heavier coming out than the new one is going in, and leaves in sections. Taking the old tops off and disposing of them is its own line on the quote rather than something folded into the stone price. The units are untouched. Only the top of them changes. Drives with a dropped kerb and a tight turn-in take a long van at an angle, and that angle decides which side the tail lift can work from. We aim for the first slot of the day where parking is tight, because that is when the street is emptiest. Where the van stands sets how the day runs.

10

Why would an Oakwood kitchen need a join at all?

There are only ever a few legal positions, and the one taken is furthest from the light. Join count and position are settled from the template drawing rather than improvised on the fitting day. A join cannot cross a cut-out, so a sink mid-run takes away the position you would have used. A hob cut-out and the floor penetration feeding it have to land over the same cabinet, and where they do not it is the stone that gets redrawn rather than the pipework. Joins are pulled with suction clamps and finished flush, then colour-matched, which is the last thing done rather than the first. A galley is levelled as one plane, both sides together.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Karem did a fantastic job at installing my antique bronze mirror for my coffee/drinks unit. He was really professional and his communication throughout was clear.”
KalsGoogle review
★★★★★
“We have a new kitchen. Our builder recommended Worktop Worx for our worktop. Now we have an amazing worktop very good price too. Really recommend. They were really good to us. 10/10”
j thomasGoogle review
★★★★★
“We recently had the Arctic Starburst worktop installed by Worktop WorX and it looks amazing. The subtle sparkle really catches the light and gives the kitchen a clean, modern feel. The Arctic Starburst surface feels high quality, durable, and is easy to keep clean. The finish and installation from Worktop WorX were spot on. Really happy with the result and would definitely recommend both Arctic Starburst and Worktop WorX to anyone upgrading their kitchen.”
Han LeeGoogle review · Arctic Starburst

Next step

Get your Oakwood kitchen priced

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.