The housing stock
What we are usually working with in Royal Albert Wharf
The room is square, the walls are plumb and the floor is flat, so almost every complication in the job belongs to the building rather than the kitchen. A run that has to be scribed twice takes an hour longer than one that does not, and the day is costed with that hour in it. Dust extraction indoors, or the cut happens outside.
All recent stock, so kitchens are open-plan with a 2.6m to 3m run of handleless units and a compact peninsula, sized to a modern flat rather than a family house.
Replacement work is mostly owners upgrading a builder-grade top or repairing a chipped composite around the sink. Shared lifts across multiple cores make this a slow building to work in, so we allow a longer window than the fit itself needs. Service access is through a courtyard with bollards and a small number of shared lifts serving several cores, which means a booking and often a wait. The development sits at the end of a long approach past the dock with limited through-traffic, so allow travel time but expect a clear road at the end of it.
A riverside block is a managed building with a booked goods lift, a loading bay and a concierge, and all three have to line up on the same day. Cam-lock carcasses are pulled up square and screwed together properly before stone is bonded across them. The units are shimmed to one datum before stone touches them.
The buildings themselves are mostly 2016 onwards apartment block and waterside townhouse. The join count is decided by which of those the room sits in.
Quartz and stone worktops in Royal Albert Wharf