Skip to content

Lewisham · SE6

Kitchen worktops in Rushey Green

Corbett-built terraces east of the main road with the standard narrow rear addition — 2.4m to 3m galleys until a side return goes in, after which they become 4m kitchen-diners with an island and a rooflight.

The housing stock

What we are usually working with in Rushey Green

late Victorian Corbett terraceEdwardian terracepostwar infill flats

Corbett-built terraces east of the main road with the standard narrow rear addition — 2.4m to 3m galleys until a side return goes in, after which they become 4m kitchen-diners with an island and a rooflight.

Whether there's a side passage decides the job — where one exists you can get a full-length piece into a rear extension without touching the hallway.

Long uniform streets with permit bays and no drives, plus shared side passages between pairs of houses that give rear access on some plots but not others.

On these streets the housing is late Victorian Corbett terrace, Edwardian terrace and postwar infill flats. That mix is why two jobs on the same road can run completely differently.

The kitchen normally sits in the back addition or a later side return, which puts the run against the oldest and least straight wall in the building. Two to three hours on site with a laser, once the units are fitted, fixed and level. The room as it is, to the millimetre.

These were built with a scullery that has since been swallowed by an extension, leaving a change of floor level roughly where the run crosses. The day is planned backwards from the hall. Walked, measured, protected, then lifted.

A low sill over the sink run is what decides between an upstand and stone dying into a window board, and there is often less clearance than an upstand is tall. Internal corners are machined with a radius and polished, and kept well clear of any join or cut-out. The drawing decides it, not the fitter.

Where the side return has been filled in, the old external wall is now an internal one and still carries its render, its gutter line and its old fixings. The day is planned backwards from the hall. That is the shape of the day.

The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. Cutting several kitchens from different slabs and calling them matched is where firms get caught out. Proven on the bench before dispatch.

Access. Long uniform streets with permit bays and no drives, plus shared side passages between pairs of houses that give rear access on some plots but not others.

At a glance

Borough
Lewisham
Postcodes
SE6
Covered from
New Malden patch
Lead time
3–7 working days from template

There is nothing to visit in Rushey Green. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.

Questions

Working in Rushey Green

Do you fit kitchen worktops in Rushey Green?

Yes. Corbett-built terraces east of the main road with the standard narrow rear addition — 2.4m to 3m galleys until a side return goes in, after which they become 4m kitchen-diners with an island and a rooflight. Enforcement zones rarely accept a trade van unloading stone as an exemption, so this gets sorted before the date is confirmed rather than argued about afterwards. Pieces are loaded in reverse fitting order so the first thing off the van is the first thing that goes down. That is the last thing settled before dispatch.

What kind of kitchens do you usually work on in Rushey Green?

late Victorian Corbett terrace, Edwardian terrace and postwar infill flats. These were built with a scullery that has since been swallowed by an extension, leaving a change of floor level roughly where the run crosses. The day is planned backwards from the hall. Walked, measured, protected, then lifted.

Is access difficult in Rushey Green?

Long uniform streets with permit bays and no drives, plus shared side passages between pairs of houses that give rear access on some plots but not others. The side passage is the measurement that matters, because a piece has to be carried flat down it and then turned in at the back door, and the turn is always tighter than the passage. The fitting day is planned backwards from that point, before anything comes off the van. None of it is worked out on the doorstep.

What do you get asked for most in Rushey Green?

Worktop installation, worktop templating and worktop fabrication, in that order. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. Cutting several kitchens from different slabs and calling them matched is where firms get caught out. Proven on the bench before dispatch. Whether there's a side passage decides the job — where one exists you can get a full-length piece into a rear extension without touching the hallway.

What decides the price of a worktop in Rushey Green?

Side-return kitchens are long and narrow with one outside wall, and the wall the run sits against is often the oldest, least straight surface in the house. On the day that means dry-laying the whole layout first and only then pulling and bonding the joins. Dry-lay first, always. A low sill over the sink run is what decides between an upstand and stone dying into a window board, and there is often less clearance than an upstand is tall. Internal corners are machined with a radius and polished, and kept well clear of any join or cut-out. The drawing decides it, not the fitter. Material runs from £110 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines rather than rolled into one figure.

Do you work in flats and leasehold properties in Rushey Green?

The same building type can arrive as a careful one-off kitchen or as a fast turnaround, and the honest answer is that they are priced differently. The template happens when the units are in, fixed and level, whoever is fitting them. Fitted, fixed and level, then we come. Tell us the building when you book and the lift, the stair turn and any freeholder notice get built into the day rather than found on it.

Next step

Get your Rushey Green kitchen priced

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7479 194398