What the housing here calls for
Where ownership is split across a building, the common parts belong to someone else and the carry route is negotiated rather than assumed. Floors and units are protected before anything comes through the door, communal or otherwise. A void between tenancies has no spare days in it.
Getting stone into the room
Long uniform streets with permit bays and no drives, plus shared side passages between pairs of houses that give rear access on some plots but not others.
Applying for a suspension means naming a length of kerb and a date, and moving the date generally means applying for it again. The van is loaded to the sequence the carry needs, which is not always the sequence that fills it best. Loaded for the carry, not for the van.
The building, and what it does to the job
Around Rushey Green, the bands run low by London standards. It decides how many hands the day needs, which is the part people find out late. The day is planned to the stock, not to a standard slot.
Whether there's a side passage decides the job, where one exists you can get a full-length piece into a rear extension without touching the hallway.
Where a run finishes into a reveal, the depth of that reveal is taken at worktop height and nowhere else. The piece is offered up, marked, taken back out and cut, and that cycle can run twice before anything is bonded down. Dry-lay, mark, cut, then bond.