The building, and what it does to the job
Rental turnover drives the schedule, so it is template and fit inside the same changeover week or the job does not happen at all.
Hillingdon · UB7
A lot of houses in multiple occupation and airport-worker rentals, so the specification is durable and plain: two-wall kitchens, 3m runs, minimal detailing and nothing that will chip in shared use.

The housing stock
Injected damp courses and re-rendered lower walls leave the bottom metre standing proud of everything above it. Pieces come in the order they go down, because there is rarely anywhere to stand the second one while the first is bedded. The whole run is dry-fitted before any adhesive is opened.
Sipson Road and Sipson Lane are narrow and carry constant airport traffic, and on-street space competes with people parking for the airport.
Floors are the original joists with a later acoustic layer laid over them, and that layer is not flat where it meets the doorways. Old skirting behind the carcasses is checked at worktop height, since that is what decides whether the top can go back tight. Nothing is screwed into plasterboard and hoped for.
Locally the mix runs to 1930s semi, ribbon-development terrace and airport-worker rental conversion. Each of those behaves differently once the old top comes off.
There is nothing to visit in Sipson. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.
Get a fixed quote Free samples
Hillingdon
Rental turnover drives the schedule, so it is template and fit inside the same changeover week or the job does not happen at all.
Around here the housing went up after the First World War, so the walls run truer than the London average. What the old top was hiding is the real question, and it only answers on the day. The replacement fits the kitchen that is there now.
Butt-jointing over the gable puts the seam a few hundred millimetres back from the corner, below the eye line instead of straight across it. Support goes in before stone does, so whatever steel, plywood or extra noggin the shape calls for is fitted while the room is still empty. Clamps close the joint, colour match settles it.
The person choosing the worktop is not the person using it, and that shifts the balance from appearance towards running cost. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. A plumber either side of us.
Waterfall ends See the options
Services
Nine services, ordered by what Sipson's housing stock actually asks for most.
Old tops out, stone down, your units kept
Read moreFitted, scribed, joined and sealed by our own installers
Read moreSupply and fit, priced by the square metre
Read moreVanity tops and bathroom surfaces from the same slabs
Read moreHome and trade bar surfaces, with the overhang supported properly
Read moreCut, profiled and drilled to your existing bases
Read moreCounter tops with the transaction shelf and knee recess worked in
Read moreCut from the same slab run as the worktop
Read moreCut, mitred, polished and dry-assembled in our workshop
Read moreNearby
Sipson is one of 22 places we cover in Hillingdon. Worktops across Hillingdon
Questions
Yes. A lot of houses in multiple occupation and airport-worker rentals, so the specification is durable and plain: two-wall kitchens, 3m runs, minimal detailing and nothing that will chip in shared use. A drive behind an electric gate depends on somebody being in to open it and on the gate staying open while the load comes off. The fitting slot is set around it, which is why we ask about it when the date is booked and not before we leave the yard. The carry length sets the number of hands on the job.
1930s semi, ribbon-development terrace and airport-worker rental conversion. The communal stair is wide and handsome and the flat door at the top of it is a standard leaf, which is where a long piece stops. The day is planned backwards from the hall. Where the wall bellies, the top is eased in against it.
Sipson Road and Sipson Lane are narrow and carry constant airport traffic, and on-street space competes with people parking for the airport. The van gets close to the door and the stone comes off the tail lift onto a trolley, which is about the shortest carry we ever get. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. The route is protected once and then used four times.
Worktop replacement and worktop installation, in that order. Where kitchens turn over between tenancies the priority is a surface that survives a decade of being treated as a chopping board. The carcasses have to be sound, because stone is several times the weight of what is coming off. The fastest upgrade a sound kitchen has. Rental turnover drives the schedule, so it is template and fit inside the same changeover week or the job does not happen at all.
Corner sinks and corner hobs sit exactly where the joint wants to be, so on an L the cut-out positions get settled before the join positions do. On the day that means dry-laying the whole layout first and only then pulling and bonding the joins. Waterfall legs are set before the top is bonded down. Where a corner is a couple of degrees off, a mitre cut to a theoretical ninety degrees opens on the wall side and there is no closing it afterwards. The old top has been hiding it, so the first honest look at it happens when the laminate comes off. Packing the carcasses is part of the replacement. Material starts at £110 per square metre supply only, and templating, fabrication and fitting sit on their own lines rather than inside one figure.
Access in a tenanted flat depends on the tenant, so the template and fitting dates are agreed with whoever actually holds the keys. A replacement keeps the units and changes the surface, which is the least disruptive way to do this in an occupied property. Disposal is named, not assumed. Let us know the building when you book, and the lift, the stair turn and any freeholder notice are handled beforehand rather than on the fitting day.
Taking the old tops away is a line rather than an assumption, so it comes off if you do not want it. The design and quotation visit is free and carries no obligation, so a figure exists before any commitment. The stone carries the scribe because the wall cannot be persuaded, so back edges are cut oversize and eased in rather than dropped straight down. This is the commonest reason a replacement turns out to need more than a straight swap. The laminate has been covering it up.
Every piece is dry-assembled on the bench before it is loaded, so a fabrication mistake is found in the workshop rather than in your kitchen. Floors and units are protected before anything comes through the door. Stone cannot be filled and made good the way laminate can, so a damaged piece is remade rather than patched. A short hard approach with no steps means a full-length piece can be walked in flat by two people rather than turned up on edge. With no room to turn, the old top gets cut up in the kitchen instead, which is dusty work and needs the room emptied first. A stone top coming out whole needs the same crew as one going in.
Where there is a lift, whether it can be booked out and padded matters as much as its size. What decides it is not the width of the stairwell but the length of piece that can be turned in it. Splitting a run costs a join, and that is the price of getting stone into the room at all. Where the van stands level with the front of the house a piece gets handled twice instead of five times, and stone breaks on handling rather than on the road. We plan the strip-out and the carry as one movement so the kitchen is only out of use for a single day. Timing the two carries is most of the planning.
An upstand covers the gap where the worktop meets a wall that is not flat, which is its real job. Ordered later from a different batch, the match is not reliable where the two pieces meet. What decides between them is usually the wall: what it is built of, how flat it is, and where the sockets ended up. Kitchens in the upper flats often sit in the return wing at half-landing level, so there are three or four steps inside the flat before the room is reached at all. We measure the front door, the hall width and the turn into the kitchen before anything comes off the van, because a 3m piece has to swing through that corner on edge and stone does not bend to help you. The shell has the last word on fitting day.
Reviews
Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.
“Karim is excellent, he did superb job with Templeting and fitting my kitchen, highly recommend”
“I am really happy with the work! He fitted my kitchen granite worktop really nicely and got the job done on time, just as promised. He was friendly, professional, and made sure everything was done the way I wanted. Would definitely recommend Karam to anyone looking for a great job!”
“Nice work from worktop worx. Highly recommended”
Next step
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.