The housing stock
What we are usually working with in Upton Park
Plasterboard partitions mean light scribes and clean joins, and the fabrication effort moves to the visible faces instead. A run that has to be scribed twice takes an hour longer than one that does not, and the day is costed with that hour in it. Sink and hob seated and sealed before we go.
The market street and the surrounding shopping parades are congested through the day with loading restrictions, so residential drops are best mid-morning off the side streets. The redeveloped stadium site apartments have their own service entrance and lift booking system, quite unlike the terraces around them. Heavy cooking use here means people want deep upstands and a solid splashback behind the range, not a 6mm glass panel.
Block and beam floors with blockwork walls are true enough that the scribes are light and the joins can be pulled tight. The lift is measured before the piece is loaded, and once inside the flat the fitting is quick by comparison. One datum, taken off the highest point of the floor.
The fabric of the place is Edwardian terrace, converted terrace flat and 2010s onwards stadium-site apartment block. That is why the same worktop costs differently two doors apart.
There is nothing to visit in Upton Park. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.