The housing stock
What we are usually working with in Alperton
These kitchens give three metres of usable wall and no more, so a dimension out by a few millimetres costs a whole run rather than a piece. Protection down, dry-lay, scribe, then bond: the order matters more in a difficult room than an easy one. Access, floor and wall in that order, then stone.
The houses have driveways and easy kerbside loading; the towers along the canal have controlled underground parking with height barriers that a Luton or a tail-lift van will not clear, so the drop-off point needs confirming before the slab is loaded. Height restrictors on the apartment car parks are the recurring problem here, and the fix is a smaller vehicle plus a longer walk rather than a bigger crew.
Concrete panel walls bow noticeably over the length of a run, so the template picks up the real line and the back edge is cut to follow it. Carcass heights are corrected on the day where legs have bottomed out, because a top will not bridge a step between units. The house sets the order of work.
The housing behind these kitchens is 1930s semi, canal-side 2010s-2020s tower and post-war maisonette. The floor datum is the thing that changes most between them.
There is nothing to visit in Alperton. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.