The housing stock
What we are usually working with in Alperton
These kitchens give three metres of usable wall and no more, so a dimension out by a few millimetres costs a whole run rather than a piece. Protection down, dry-lay, scribe, then bond: the order matters more in a difficult room than an easy one. Access, floor and wall in that order, then stone.
In the flats the peninsula end usually needs a 300mm to 400mm overhang for stools, which means brackets or a thicker deck.
Two entirely different jobs in one district: interwar semis with a rear kitchen and a lean-to being replaced by a proper extension, and canal-side apartment blocks with compact open-plan kitchen-living rooms where the worktop doubles as the only dining surface. The houses have driveways and easy kerbside loading; the towers along the canal have controlled underground parking with height barriers that a Luton or a tail-lift van will not clear, so the drop-off point needs confirming before the slab is loaded. Height restrictors on the apartment car parks are the recurring problem here, and the fix is a smaller vehicle plus a longer walk rather than a bigger crew.
Concrete panel walls bow noticeably over the length of a run, so the template picks up the real line and the back edge is cut to follow it. Carcass heights are corrected on the day where legs have bottomed out, because a top will not bridge a step between units. The house sets the order of work.
The housing behind these kitchens is 1930s semi, canal-side 2010s-2020s tower and post-war maisonette. The floor datum is the thing that changes most between them.
Quartz and stone worktops in Alperton