The housing stock
What we are usually working with in Canada Water
The lift car, the loading bay and the building manager decide the piece sizes here, not the slab. Protection down, dry-lay, scribe, then bond: the order matters more in a difficult room than an easy one. Every unit gets a level on it before a piece lands.
The kitchen and the dining space share one room front to back, with the stair enclosure taking a bite out of one side of it. Silicone goes on last and the surface is left clean, since there is nothing else in a finished flat to hide behind. Nothing is screwed into plasterboard and hoped for.
Most of what we quote on here is 1990s dockside flats, 2010s apartment block and 2020s regeneration tower. Each of those behaves differently once the old top comes off.
Access. Everything goes through a concierge and a booked service lift with a delivery slot, loading bays are timed, and the goods route runs through basement car parks with 2m headroom that a long-wheelbase van clears but a roof-racked slab frame does not.
There is nothing to visit in Canada Water. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.