What the housing here calls for
The catch with a galley is that both runs are seen end-on from the doorway, so any difference in overhang between the two reads immediately. Support goes in before stone does, so whatever steel, plywood or extra noggin the shape calls for is fitted while the room is still empty. A seam under a rooflight gets the extra minutes.
Kitchens go in near the end of a conversion, behind the plastering and the flooring, by which point the programme has already absorbed whatever slipped earlier. Old tops out in the morning, new stone down and sealed the same afternoon. A deposit deduction rarely covers a new top.