The housing stock
What we are usually working with in Harold Wood
A side passage and a back door mean the stone rarely has to come through the house, which changes the job more than most people expect. A run that has to be scribed twice takes an hour longer than one that does not, and the day is costed with that hour in it. The first hour is protection and packing, not stone.
New-build carcasses on the modern estates are often lightweight and not designed for stone, so we brace and level them before loading a 20mm slab onto them.
The consumer unit and the meter tails often sit in a cupboard in the corner of the kitchen, and that cupboard has to stay reachable whatever goes in around it. The side route is boarded where it crosses a soft path or a border, and the gate is measured rather than assumed. The building moved decades ago and the fit allows for it.
Around here the stock is 1930s semi, Edwardian terrace, post-war semi and 2010s new-build on the former hospital site. They were built to different tolerances, and the stone has to absorb that.
Access. Older streets have drives and dropped kerbs; the new development has narrow shared-surface roads, allocated bays and parking enforcement, so we book a slot rather than assume a space.
There is nothing to visit in Harold Wood. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.