The building, and what it does to the job
Extensions here are usually built right up to the boundary, so there is no side gate left and every slab comes through the front of the house.
Hounslow · TW4 TW3
Interwar semis with the original small kitchen extended at the rear. Larger households push for storage and length, so you get 4m back runs, a bank of tall units and the hob relocated onto an island.

The housing stock
Ceilings are lath and plaster at the front and plasterboard in the extension, and the join between the two marks where the original back wall stood. A run that has to be scribed twice takes an hour longer than one that does not, and the day is costed with that hour in it. Every unit gets a level on it before a piece lands.
The A4 Bath Road makes delivery simple and driveways are common, but airport traffic on the Great South West Road and Piccadilly line works affect what time you can realistically arrive. Interwar semis with the original small kitchen extended at the rear.
The under-stair cupboard opens off the kitchen in most of them, and its door swing is the reason a corner run stops where it does. A run crossing from the original room into the extension is packed to one plane before the stone is offered up. A structure this old is worked with, not corrected.
The stock we template in here is Interwar semi, 1930s terrace and postwar infill. Which of those you have decides most of what follows.
There is nothing to visit in Hounslow West. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.
Get a fixed quote Free samples
Hounslow
Extensions here are usually built right up to the boundary, so there is no side gate left and every slab comes through the front of the house.
A pop-up socket in the surface is one more cut-out through the full thickness, and it wants the same clear space beneath it that a sink does. On the day that means dry-laying the whole layout first and only then pulling and bonding the joins. A seam under a rooflight gets the extra minutes.
A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. Several flats can be done on consecutive days, with one kitchen out of use at a time. Nothing else in the room has to change.
Locally the stock leans newer than the London norm. A plumber disconnects before we arrive and reconnects after we have gone. Disposal is a line on the quote, not a surprise.
Corners and joins See the options
Services
Nine services, ordered by what Hounslow West's housing stock actually asks for most.
Old tops out, stone down, your units kept
Read moreFitted, scribed, joined and sealed by our own installers
Read moreSupply and fit, priced by the square metre
Read moreVanity tops and bathroom surfaces from the same slabs
Read moreHome and trade bar surfaces, with the overhang supported properly
Read moreCut, profiled and drilled to your existing bases
Read moreCounter tops with the transaction shelf and knee recess worked in
Read moreCut from the same slab run as the worktop
Read moreCut, mitred, polished and dry-assembled in our workshop
Read moreNearby
Hounslow West is one of 19 places we cover in Hounslow. Everything in Hounslow
Questions
Yes. Interwar semis with the original small kitchen extended at the rear. Larger households push for storage and length, so you get 4m back runs, a bank of tall units and the hob relocated onto an island. A dropped kerb wide enough for a car is not always wide enough for a long-wheelbase van, and the width of the crossing decides the rest. A van that has to move mid-fit costs the best part of an hour and takes a man off the tools to do it. The first hand off the van is the one holding the clock.
Interwar semi, 1930s terrace and postwar infill. The chimney breast served a back boiler and is usually still standing, so there is a shallow recess on one side of the room. Access is usually the easy part here, as most of these have a side gate and a back door straight into the kitchen, so we carry down the side alley rather than through the house and keep the mess outside. What the building will take decides how it is fixed.
The A4 Bath Road makes delivery simple and driveways are common, but airport traffic on the Great South West Road and Piccadilly line works affect what time you can realistically arrive. Suction lifters need a clean dry face to hold, so in the wet the pads come off and the piece goes back to being carried on webbing by hand. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. Cutting a top down indoors means emptying the room first.
Worktop installation and worktop replacement, in that order. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. A day, not a project. Extensions here are usually built right up to the boundary, so there is no side gate left and every slab comes through the front of the house.
On a book-matched pair the halves are laid out so the mirror line runs down the length of the piece, and once that line is set the top cannot be turned round to suit anything else. A layout that has been packed and levelled run by run instead of to one datum shows as a step where two pieces meet. Overhangs are measured off the finished carcass. Two alcove pieces will not swap over however similar they look, so they are marked left and right at the bench and stay that way to the van. The old top has been hiding it, so the first honest look at it happens when the laminate comes off. The alcove was never square and it still is not. Material is from £110 per square metre supply only, and the templating, the fabrication and the fitting are each quoted on their own line.
An owner paying for this directly tends to want the reasoning as much as the number, so a quote that explains why a join sits where it does is worth more than a cheaper one that does not. If the carcasses are tired the honest answer is that stone will find that out, and it is better said before than after. The gap between tenancies is the whole window. If we know the building when you book, the lift, the stair turn and any freeholder notice are worked into the day rather than found on it.
Variation past what packing can take up has to be corrected in the carcasses before we cut, because the template records the units as they stand. Stone does not flex, so a run that rocks on its carcasses rocks just as badly once it is stone. A chimney breast left in place splits a wall into two alcoves, and the two are rarely the same width and rarely parallel to each other. This is the commonest reason a replacement turns out to need more than a straight swap. What passed for a fit in chipboard will not pass in stone.
Our own installers do the carry, so there is nobody in the middle to argue with about it. Door frames and the stair route are protected too, since most contact happens on the way in. The workmanship guarantee runs 5 years on every kitchen we fit. A loading bay or a red route puts a clock on the unload, so the pieces come off in the order they will be fitted rather than the order they were loaded. With no room to turn, the old top gets cut up in the kitchen instead, which is dusty work and needs the room emptied first. Out and in happen along the same protected route.
If the sink or hob changes after the template, the drawing changes first and nothing is cut meanwhile. A sit-on sink and an undermounted one are different cut-outs, so which it is gets settled before the template. A Belfast or butler sink has to be installed and at its final height before the template, because the stone is cut to sit on it. A waterfall leg is a separate piece bonded to the top on a mitre, so the floor it stands on has to be level enough for that mitre to close along its full height. Joins are pulled with suction clamps and finished flush, then colour-matched, which is the last thing done rather than the first. Packing goes under the units, not under the stone.
Where there is no room for a separate drainer, grooves are usually what gets specified instead. The grooves sit inside the depth of the top with stone left either side, so a shallow run limits them. They read strongly across a dark stone and are nearly invisible on a pale one, so look before deciding. The consumer unit and the meter often sit high on the wall at one end of the kitchen, and neither of them is going to move to suit a run of stone. The fitting day is planned backwards from all of it, before the first piece comes off the van. A bad floor is corrected under the carcass, never with sealant.
Reviews
Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.
“Professional, polite and friendly service. Very pleased with finished product.”
“I used Karem’s services 5 years ago for purchasing and fitting the quartz worktop in my then brand new kitchen. The price was reasonable and the service reliable and spot on, no delays in fitting, misunderstanding or excuses. I recommended him to a friend, who also used his services and they were happy too! If I need to order new kitchen work top again, I would definitely use him again. Thanks Karem!”
“Karem did an excellent job on my kitchen. He was professional, reliable, and paid great attention to detail. The finish looks amazing and has completely transformed my kitchen. Thank you! Would highly recommend his work!”
Next step
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.
Worth reading next