The housing stock
What we are usually working with in Ilford
Lath and plaster, a settled floor and a hall with a turn in it are the three things that decide how this job runs. The old tops come off in pieces, and what is under them decides whether the units need levelling before anything new goes on. Cutting the old top out saves the units below it.
Assume no kerbside parking outside the door, we plan Ilford jobs around a suspension or an early start, and anything over 3m gets checked against the hallway dogleg before it is cut. Ilford Lane and the roads off Cranbrook Road are permit-controlled and parked solid both sides, so a slab often comes in on foot from a suspended bay round the corner.
The rear extension is frequently original rather than added, which means it is solidly built and just as far out of square as the rest of the house. The old top ran under the tiles, so taking it out brings the bottom course with it and the upstand covers what is left. The floor has dropped since the kitchen went in.
The kitchens we see here sit in Victorian terrace, Edwardian bay-fronted terrace, 1930s mansion block and 2010s-2020s new-build flat. Each of those puts the services somewhere else, and the cut-outs follow.
Access. New-build blocks mean lift access, booked loading bays and a building manager who wants notice in writing.
There is nothing to visit in Ilford. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.