Getting stone into the room
Most houses have a drive, but it is usually already holding two cars.
Hounslow · TW3
1930s semis where the kitchen has been pushed out into a rear conservatory or a full-width extension. Family cooking, so double ovens, a long prep run against the back wall and often a peninsula rather than a full island.

The housing stock
Gas, waste and later wiring were boxed in against the wall long after the house was built, and that boxing is what the run has to clear. A run that has to be scribed twice takes an hour longer than one that does not, and the day is costed with that hour in it. Suction pads will not hold on a wet or dusty face.
Edwardian terraces are wider and taller than the Victorian houses next to them, so the kitchen usually takes a full-width rear room rather than a narrow outrigger. We measure the front door, the hall width and the turn into the kitchen before anything comes off the van, because a 3m piece has to swing through that corner on edge and stone does not bend to help you. Levelled first, then set, then sealed.
The building types here are 1930s semi, Edwardian terrace and postwar infill. Which of those you have decides most of what follows.
Access. Lampton Road is a busy through route with controlled parking either side of it. Most houses have a drive, but it is usually already holding two cars.
There is nothing to visit in Lampton. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.
Get a fixed quote Free samples
Hounslow
Most houses have a drive, but it is usually already holding two cars.
Conservatory-style rear extensions here have low cill heights, so check the window board clash before you set an upstand height you cannot achieve.
A window board sitting below finished worktop height leaves two choices, drop the top under it or notch the stone around it, and both cost more than a straight run. Where the strip-out and the template happen on the same visit it gets measured properly, with the old top already off. Found at template, not on fit day.
In this corner of the borough, the inter-war semi is the dominant house type. The old top usually tells us what the next one on the street will be hiding. Priced on the units we find, not the ones on the drawing.
Corners and joins See the options
Services
Nine services, ordered by what Lampton's housing stock actually asks for most.
Old tops out, stone down, your units kept
Read moreFitted, scribed, joined and sealed by our own installers
Read moreSupply and fit, priced by the square metre
Read moreVanity tops and bathroom surfaces from the same slabs
Read moreHome and trade bar surfaces, with the overhang supported properly
Read moreCut, profiled and drilled to your existing bases
Read moreCounter tops with the transaction shelf and knee recess worked in
Read moreCut from the same slab run as the worktop
Read moreCut, mitred, polished and dry-assembled in our workshop
Read moreNearby
Lampton is one of 19 places we cover in Hounslow. Hounslow in full
Questions
Yes. 1930s semis where the kitchen has been pushed out into a rear conservatory or a full-width extension. Family cooking, so double ovens, a long prep run against the back wall and often a peninsula rather than a full island. Where the household has used up the visitor permits it gets for the year, the remaining options are a suspension or a paid bay and both belong on the quote. A van that has to move mid-fit costs the best part of an hour and takes a man off the tools to do it. Forty metres of carry changes the shape of the whole day.
1930s semi, Edwardian terrace and postwar infill. The rear extension is frequently original rather than added, which means it is solidly built and just as far out of square as the rest of the house. The day is planned backwards from the hall. Carried once, and carried properly.
Lampton Road is a busy through route with controlled parking either side of it. Most houses have a drive, but it is usually already holding two cars. Carrying through the house means protecting the whole route first: floor boarded, banister padded, and the front door held open on a wedge rather than by hand. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. Nothing new comes down a hall still full of old top.
Worktop installation and worktop replacement, in that order. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. A void week is the entire schedule. Conservatory-style rear extensions here have low cill heights, so check the window board clash before you set an upstand height you cannot achieve.
Peninsula tops are often the longest single piece in the kitchen, so if anything in the layout is going to force a second slab it is generally this one. On the day that means dry-laying the whole layout first and only then pulling and bonding the joins. A corner that will not close is never forced. A cill projecting forward of the plaster line pushes the back edge out, and the units then stand off the wall by that amount for the whole length. The old top has been hiding it, so the first honest look at it happens when the laminate comes off. It is the usual surprise, and it is a known one. Material is from £110 per square metre supply only, and the templating, the fabrication and the fitting are each quoted on their own line.
Mixed ownership means the decision-maker is not always the person who lets us in, so it is worth being clear early about who signs the quote off. A replacement keeps the units and changes the surface, which is the least disruptive way to do this in an occupied property. The surface changes and the kitchen stays the one they know. If we know the building when you book, the lift, the stair turn and any freeholder notice are worked into the day rather than found on it.
Packing takes up small variation. It is not there to hide something that belongs in the units. Levelling belongs in the carcasses, on their own legs and packers. Stone does not flex, so a run that rocks on its carcasses rocks just as badly once it is stone. Where the sill lands inside the height an upstand would occupy there is no upstand, and the stone either dies into the reveal or stops short of it. This is the commonest reason a replacement turns out to need more than a straight swap. It was there long before we were.
Every run, cut-out, edge, join and groove set is a line, which is what makes it comparable with anyone else’s. Taking the old tops away is a line rather than an assumption, so it comes off if you do not want it. Casement handles and stays swing down into the space above the worktop, so the clearance that counts is the one measured with the window open. We would rather find it at template than on the morning, which is why the templater looks behind the units. The old top hid it. The drawing will not.
Granite is porous to varying degrees, so it is sealed when we fit it and topped up over the life of the worktop. Granite tells you when the seal wants topping up: water stops beading on the surface and starts darkening it instead. Wider halls make the carry noticeably easier, and that alone can remove a join that a narrower terrace would have forced into the run. Scribing takes longer than the carry does, so the quiet half of the day is the half that runs over. Old floors get packed, not argued with.
A groove set is its own item on the quote rather than something rolled in with the sink cut-out. Grooves and an undermounted bowl are usually specified together, since the grooves are run to the bowl edge. They read strongly across a dark stone and are nearly invisible on a pale one, so look before deciding. Original quarry tile is often still down under two or three later floor coverings, which is why the finished floor height is rarely what anyone expects. The fitting day is planned backwards from all of it, before the first piece comes off the van. Nothing is cut in the room if the shop could do it.
Reviews
Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.
“Karem did an excellent job on my kitchen. He was professional, reliable, and paid great attention to detail. The finish looks amazing and has completely transformed my kitchen. Thank you! Would highly recommend his work!”
“Excellent work and highly recommend. Very professional and did an outstanding job with my worktop. Karem responded very quickly and swiftly, top guy!”
“Perfect service,the best on this job”
Next step
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.