The building, and what it does to the job
Around here a large part of the housing has been built within the last decade and a half. The lift car is part of the specification here. The units stay and only the surface changes, so the whole job turns on what the carcasses will take. The kitchen goes back into use the same evening.
The external wall is uninsulated in the blocks that have not been refurbished, and the corner it makes with the flank wall runs cold enough to show behind a cupboard. The stairwell half-landing is usually the tightest point on the whole route and it dictates the maximum piece. The building moved decades ago and the fit allows for it.







