The housing stock
What we are usually working with in Mill Hill East
The lift car, the loading bay and the building manager decide the piece sizes here, not the slab. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. Siliconed to the top, never grouted.
Almost entirely new-build estate housing, so kitchens arrive as developer-standard open-plan layouts with a 3m run and an integrated appliance bank, and the work is upgrading tops and adding a matching upstand or splashback within the existing units.
Developer units here are set out to the millimetre, so a template that respects the existing carcass line will beat one that measures off the plasterboard. Townhouses put the kitchen on the ground floor with a small utility cupboard rather than a separate room. New estate roads are wide and well surfaced with allocated parking, though visitor bays are scarce and some blocks have underfloor parking with height limits. Apartment deliveries need a lift booking with the managing agent.
Underfloor heating in the screed means nothing is fixed into the floor, so an island is anchored to the carcasses alone. Panels come off the same slab as the tops so the colour and the movement carry from horizontal to vertical. Solid plaster on brick takes a panel; a hollow wall wants thought.
The housing here takes in 2010s-2020s new-build houses and apartments, converted barracks buildings and 1930s stock at the edges. Each of those behaves differently once the old top comes off.
Quartz and stone worktops in Mill Hill East