The housing stock
What we are usually working with in Shadwell
Underfloor heating in a screed rules out fixing into the floor and rules out standing anything heavy on a single point. Protection down, dry-lay, scribe, then bond: the order matters more in a difficult room than an easy one. Packers under the carcass, not shims under the stone.
Newer towers near the station have compact open-plan kitchens with a short island of 1.6m to 2m.
Heavy-use family kitchens here get an honest conversation about edge chipping and overhang support rather than the thinnest profile available. The older blocks have separate kitchens of about 2.2m in an L, often serving large households, with heavy daily use and a preference for hard-wearing dark quartz. The through road is a red route and the market street is closed to vehicles during trading, so timing the drop matters more than distance.
Every flat on the floor is the same plan handed left and right, so the room is predictable even where the building is not. If the diagonal is short we either split the run with a planned join or, on lower floors, carry up the stairwell, which needs the half-landing turn checking as well. Settlement is packed out, never levered out.
What we are cutting for, here, is post-war council block, 1980s dock-edge housing and 2010s onwards residential tower. None of them is harder than the others; they are awkward in different ways.
Quartz and stone worktops in Shadwell