The housing stock
What we are usually working with in Shadwell
Underfloor heating in a screed rules out fixing into the floor and rules out standing anything heavy on a single point. Protection down, dry-lay, scribe, then bond: the order matters more in a difficult room than an easy one. Packers under the carcass, not shims under the stone.
Heavy-use family kitchens here get an honest conversation about edge chipping and overhang support rather than the thinnest profile available. The through road is a red route and the market street is closed to vehicles during trading, so timing the drop matters more than distance.
Every flat on the floor is the same plan handed left and right, so the room is predictable even where the building is not. If the diagonal is short we either split the run with a planned join or, on lower floors, carry up the stairwell, which needs the half-landing turn checking as well. Settlement is packed out, never levered out.
What we are cutting for, here, is post-war council block, 1980s dock-edge housing and 2010s onwards residential tower. None of them is harder than the others; they are awkward in different ways.
Access. Estate blocks have small lifts and long deck walkways; the new towers have a service lift but need a permit-to-work and a booked slot from the managing agent.
There is nothing to visit in Shadwell. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.