Bromley · BR5

Kitchen worktops in St Paul's Cray

Standardised post-war estate kitchens, typically a straight 2.7m run under a window with a separate larder cupboard, and a back door into a rear garden. Most jobs are replacing tired laminate on existing base units rather than a full redesign.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Induction hob set into an Enzo run below a full-height matching splashback, under the painted mantel canopy

The housing stock

What we are usually working with in St Paul's Cray

The original plan had one sink position, and moving it means taking a waste through a wall that does not want to be cut. Taking the old tops off is also the first honest look at what has been going on underneath them. The old top comes off in pieces, not whole.

Existing base units on this stock are often out of level by 10mm or more, so we shim and check against a datum before setting down, otherwise the joint opens up.

The skim over dense block is thin and dishes out round a hole, so a fixing wants a hammer drill and the dust travels through the flat. Ex-council flats and maisonettes are built in dense concrete and blockwork, so anything that has to be fixed back, such as brackets under a peninsula or support for an end panel, goes in with proper anchors and an SDS rather than plasterboard fixings. Nothing goes back on carcasses the building has pulled out of square.

The houses and blocks behind these jobs are 1950s cottage estate, 1960s low-rise flats, post-war terrace and 1990s housing association infill. The join count is decided by which of those the room sits in.

Access. Wide estate roads and space to park, but long shared footpaths from the road to individual front doors and a lot of properties with only a pedestrian gate.

There is nothing to visit in St Paul's Cray. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.

Borough
Bromley
Postcodes
BR5
Covered on
our south east London run
Lead time
5–10 working days from template

Get a fixed quote Free samples

  • 1950s cottage estate
  • 1960s low-rise flats
  • post-war terrace
  • 1990s housing association infill

Bromley

St Paul's Cray in the housing figures

In this neighbourhood the great majority of what is standing is post-war, on planned estate layouts. Socket and switch positions have to be final before the panel is templated. Scribed where the wall bows rather than packed out.

Getting stone into the room

The side passage is the measurement that matters, because a piece has to be carried flat down it and then turned in at the back door, and the turn is always tighter than the passage. With no room to turn, the old top gets cut up in the kitchen instead, which is dusty work and needs the room emptied first. Old pieces are carried out before new ones are carried in.

Edge profiles See the options

Nearby

We also work around St Paul's Cray

St Paul's Cray is one of 29 places we cover in Bromley. Our Bromley coverage

The whole New Malden patch

Questions

Working in St Paul's Cray

01

Is St Paul's Cray somewhere you actually work?

Yes. Standardised post-war estate kitchens, typically a straight 2.7m run under a window with a separate larder cupboard, and a back door into a rear garden. Most jobs are replacing tired laminate on existing base units rather than a full redesign. With no scheme to work with there is nothing to book and nobody to ring, so the only levers left are an early arrival and a word with the neighbours. A replacement is a two-way job, with old tops going out and new stone coming in, so the van needs to stay put across the whole day. A skip on the frontage takes the space the van needed.

02

What do St Paul's Cray kitchens tend to look like?

1950s cottage estate, 1960s low-rise flats, post-war terrace and 1990s housing association infill. The handrail is fixed to the wall side of the flight, so the clear width at hand height is a hundred millimetres less than the stair measures at the tread. The plaster is bonded straight onto the concrete, so the bottom course of tiles tends to bring plaster with it when the old top comes off, leaving a rough band behind the upstand. Units kept, surface changed, one day.

03

Is access difficult in St Paul's Cray?

Wide estate roads and space to park, but long shared footpaths from the road to individual front doors and a lot of properties with only a pedestrian gate. Rear access usually lets us fit longer pieces whole, so the join count ends up decided by the slab rather than by the building. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. Half a day can go on the strip-out where the way in is tight.

04

Which jobs come up most often in St Paul's Cray?

Worktop replacement, worktop installation and worktop splashbacks & upstands, in that order. Landlord work is scheduled around void periods, so the whole thing is a fixed window and the template date matters as much as the fitting date. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Same batch, or the join will say so. Existing base units on this stock are often out of level by 10mm or more, so we shim and check against a datum before setting down, otherwise the joint opens up.

05

What sets the figure on a St Paul's Cray quote?

A run that stops in mid-air at the open end needs a finished end rather than a cut one, and that end takes the same edge work as the whole front. On the day that means dry-laying the whole layout first and only then pulling and bonding the joins. One datum for every run in the room. Where two pieces meet over a fall in the floor the join has to be flush to the hand as well as true to the level, because the eye reads the join and forgives the room. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. The sill caps the upstand before anything else does. Supply-only material opens at £110 per square metre, and templating, fabrication and fitting are quoted line by line rather than as a single number.

06

Do you handle managed buildings in St Paul's Cray?

Method statements, insurance certificates and named operatives are wanted before a crew is cleared to attend, all of which is routine when it is asked for a week out. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. What repeats across flats is recorded once and repeated. Say what the building is at the booking stage and the lift, the stair turn and any freeholder notice become part of the plan rather than a surprise.

07

Will you fit stone onto units that are not level?

Variation past what packing can take up has to be corrected in the carcasses before we cut, because the template records the units as they stand. Levelling belongs in the carcasses, on their own legs and packers. Units have to be fitted, fixed and level before templating, and it is better to hear that at the template than on the fitting day. Floors settle, and once base units are packed and levelled properly the stone sits true while everything else in the room admits it is not. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. A downstand sets the panel height, not the wall units.

08

What if something breaks during the fit?

A dropped pan years later is a different question, and stone is remade rather than filled either way. A remake goes back through the same cutting and polishing, so it is a return visit rather than a patch. Floors and units are protected before anything comes through the door. Garden routes carry their own hazards: a drain cover, a step up to a patio, wet decking, or a lawn that will not take a loaded trolley. We plan the strip-out and the carry as one movement so the kitchen is only out of use for a single day. Nothing new comes down a hall still full of old top.

09

How do you cut out for an undermounted sink?

We seat and seal the sink and hob on the day; water, waste, gas and electrics are for your plumber and electrician. The sink, tap and hob have to be physically in the room at the template, not merely ordered, because the cut-out is machined to the item itself. If the sink or hob changes after the template, the drawing changes first and nothing is cut meanwhile. Where a run finishes hard against a wall the last few millimetres are scribed, and where it finishes in open floor it is cut square and polished, which is two different jobs on one length. A layout that has been packed and levelled run by run instead of to one datum shows as a step where two pieces meet. The island is set against the perimeter, not a wall.

10

Do most St Paul's Cray kitchens take upstands or full-height splashbacks?

Socket and switch positions have to be final before templating, because the openings are machined rather than chopped out on the wall. An upstand is a slim strip that follows the worktop up the wall; a full-height splashback runs from the worktop to the underside of the wall units. The kitchen door is a fire door onto a lobby that is also the escape route, so nothing can be stood in that lobby while the work goes on. Plaster bonded straight onto concrete comes away with the bottom course of tiles, leaving a band behind the upstand. What is under the old top is the real question.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Lovely team, business and quality motivated, prompt delivery with installation. Affordable prices. Wide range of worktops available. High recommendation”
Loreta SkalisieneGoogle review
★★★★★
“Great service. Super quick and easy communication. I love my new worktop 🥹🥹”
Sara ArghirGoogle review
★★★★★
“Professional, polite and friendly service. Very pleased with finished product.”
costas andrewsGoogle review

Next step

Get your St Paul's Cray kitchen priced

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.