The housing stock
What we are usually working with in Wembley Central
Chimney breasts are often taken out at ground level and left standing above, so the middle of the run is newer wall than the two ends of it. The units stay and only the surface changes, so the job is a day, and what makes it a difficult day is the building. A single day, planned properly.
Mostly rear kitchens in narrow terraces and interwar semis, many opened into the old dining room so the run turns an L along two walls.
Match-day and event traffic management around the stadium closes and diverts roads at short notice, so a morning slot is safer than an afternoon one. Multi-generation households here cook heavily, so a second hob or a separate wet-prep sink tends to matter more than an island, and full-height splashbacks behind a wok burner are routine.
The staircase rises over the back room in a good number of these, so a sloping bulkhead sits over one end of the run and a piece cannot be stood on edge beneath it. The old top ran under the tiles, so taking it out brings the bottom course with it and the upstand covers what is left. What is behind the old splashback decides the new one.
The houses and blocks behind these jobs are Victorian bay-fronted terrace, 1930s semi, 1960s low-rise flat and 2010s infill block. A quote that ignores which one you have is guessing.
Quartz and stone worktops in Wembley Central