The housing stock
What we are usually working with in Bank
Underfloor heating in a screed rules out fixing into the floor and rules out standing anything heavy on a single point. A run that has to be scribed twice takes an hour longer than one that does not, and the day is costed with that hour in it. Older buildings get the extra hour.
The Bank junction itself is restricted to buses and cycles during weekday daytime hours, which is the single most important planning fact for a delivery here - the approach has to be worked out from the permitted streets, not the shortest route. Plan the delivery route around the Bank junction restrictions first and the kitchen second, because a wrong turn here is a fine and a missed slot.
Ceiling heights are held to the minimum the plan allows, so the panel between worktop and wall units is a short piece. Silicone goes on last and the surface is left clean, since there is nothing else in a finished flat to hide behind. Old floors get packed, not argued with.
What we are usually templating in is banking hall and office building converted to flats, Victorian commercial building with residential upper floors, modern apartment in a mixed-use scheme and small pied-a-terre flat. The differences between them show up at template, not at enquiry.
Access. Add security desks, ANPR on the City's entry points and short loading windows, and an early or late slot is usually the only practical option.
There is nothing to visit in Bank. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.