The housing stock
What we are usually working with in Moorgate
Plasterboard partitions mean light scribes and clean joins, and the fabrication effort moves to the visible faces instead. The units stay and only the surface changes, so the job is a day, and what makes it a difficult day is the building. Whatever the old top hid comes to light.
Moorgate and London Wall are busy multi-lane routes with no stopping, so deliveries go into building basements with height barriers, or onto short side-street windows early in the day. Ongoing construction across this fringe means hoardings and lane closures change frequently, so confirm the approach the morning of the fit. Windowless interiors are lit by spots and LED strip, which is unforgiving on a bad joint - dry-fit the joint and check it under the client's own lighting before it is glued.
The window line is a continuous ribbon with structural mullions, so a run under it stops at a mullion rather than at a wall. The lift diagonal governs the longest piece, so the join count is fixed at nesting and cannot be revisited on the day. The bench proves it before the van moves.
What turns up on the job sheets is modern apartment block, office to residential conversion, postwar block with flats and development on the Barbican fringe. Each of those behaves differently once the old top comes off.
There is nothing to visit in Moorgate. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.