Getting stone into the room
Concierge buildings want the goods entrance, a booked lift and proof of insurance, all of which is straightforward when it is asked for a week out. It also decides how the pieces are crated and in what order they are loaded onto the van. Polishing a piece that cannot reach the room wastes a day.
The building, and what it does to the job
Around here planned post-war layouts account for most of the housing. The corner is the piece that has to be right, and on a plan we know it falls in the same place each time. The figures set the cut list, not the other way round.
The addition wall is half a brick thick in places and has usually had a damp course injected and been re-plastered, which leaves it neither flat nor consistent. Scribing takes longer than the carry does, so the quiet half of the day is the half that runs over. Settlement is packed out, never levered out.
Gravel drives and long approaches rule out a barrow, so we plan on carrying and bring boards.
An intruding steel column, a brick pier or a downstand breaks a run that would otherwise have been one clean piece. Internal corners are machined with a radius and polished, and kept well clear of any join or cut-out. The notch is machined, never ground in later.
What the housing here calls for
Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. Cutting several kitchens from different slabs and calling them matched is where firms get caught out. The annexe top comes off the main kitchen slab.