The housing stock
What we are usually working with in Pollards Hill
Dense concrete and blockwork mean the wall cannot be chased back or packed out, so the stone carries the scribe. Pieces come in the order they go down, because there is rarely anywhere to stand the second one while the first is bedded. The route is walked before the first lift.
Two-man handling with a slab trolley matters more than van proximity. Closed-up hatches leave a shallow patch of new plasterboard right where the upstand lands, so fix through to the original blockwork rather than into the patch.
Whole streets went up to two or three plans, so the house next door has the same kitchen and forty years of extensions have made none of them measure the same. That suits a full-height piece, because a large flat panel bonded across its back is more stable on concrete than a run of small tiles ever was. A bowed wall is what decides between an upstand and a panel.
The fabric of the place is 1960s and 70s low-rise estate housing, Interwar semi and Postwar terrace. Knowing which one it is before we arrive is half the survey done.
Access. Cars park in courts and garage blocks set away from the front doors, so almost every job here involves a long carry along footpaths and through pedestrian alleys. Two-man handling with a slab trolley matters more than van proximity.
There is nothing to visit in Pollards Hill. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.