The housing stock
What we are usually working with in Seven Sisters
A stub wall divides the kitchen from the back lobby, and it rarely stayed where the original drawing put it. The fitting day is planned backwards from all of it, before the first piece comes off the van. Suction pads will not hold on a wet or dusty face.
Where the kitchen has been moved upstairs the waste run is long and shallow, so the sink cut-out position is fixed by the plumbing - template around the existing waste, not around the cabinet centre.
The stair from the street is narrow with a tight turn at the top, which caps piece length well below anything the run itself needs. The fitting itself is about squaring up to walls that look modern and are not: block or breeze walls with a skim that has been patched over decades, so we still dry-lay and scribe rather than trust the template edge. Where the wall bellies, the top is eased in against it.
The mix here is Victorian terrace, flat above shop and post-war block. That is why the same worktop costs differently two doors apart.
Access. The junction and the High Road are a red-route environment with bus lanes and no waiting, so unloading happens on the residential streets and everything is carried. Above-shop flats have a shared stair used by several tenancies.
There is nothing to visit in Seven Sisters. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.