The building, and what it does to the job
The floor is a screed over concrete finished in vinyl, hard and flat but rarely level, so the units are packed rather than the stone being cut down to meet them. Where the old top was shallower than the new one, the doors and drawer fronts are checked before anything is bedded. The building has kept moving; the new template catches up.
Repeatable layouts but a brutal carry - the podium walk plus a shallow lift car is why pieces here get jointed at the hob even when they would technically fit the kitchen.
A downstand over a run caps wall unit height before it caps anything else, and the splashback then takes its height from the steel rather than from the units. On the day it means dry-laying, marking, and cutting the scribe on site before anything is bonded. Packers go under the carcass, never under the stone.