City of London · EC3N EC3A
Kitchen worktops in Aldgate
Newer towers on the eastern edge give standard developer kitchens - a 3-3.4m run against the riser plus an island of about 2m, with an induction hob and a recirculating extract that fixes the hob position. Many of these are being upgraded from original laminate or composite to quartz within a few years of completion, so the job is a straight swap onto existing carcases.
The housing stock
What we are usually working with in Aldgate
Newer towers on the eastern edge give standard developer kitchens - a 3-3.4m run against the riser plus an island of about 2m, with an induction hob and a recirculating extract that fixes the hob position.
The Aldgate gyratory and its approaches are red route with no stopping, so everything goes through a basement service yard with a height barrier or a booked bay at the building entrance. Tower blocks run full contractor control - induction, insurance, permit to work, booked goods lift and a lift protection kit fitted before the first piece moves. Many of these are being upgraded from original laminate or composite to quartz within a few years of completion, so the job is a straight swap onto existing carcases. Straight swaps onto existing carcases still need the carcase levels checked, because developer units settle and a 3m top will rock on units that were only shimmed once.
What turns up on the job sheets is modern residential tower, office to residential conversion, 1980s-90s apartment block and mixed-use development over retail. That mix is why two jobs on the same road can run completely differently.
Plasterboard partitions mean light scribes and clean joins, and the fabrication effort moves to the visible faces instead. The template records what the building actually did, not what the plan intended, and the gap between those two is what this visit is for. Sink, tap and hob on site, not on order.
Dot-and-dab plasterboard bellies at a taped internal angle, so the run picks up a few millimetres over the last 300mm and a plan-angle mitre will not close. The template records that corner as it is, so the mitre closes tight instead of being cut to a theoretical 90 degrees. No stone is ever cut from a plan.
There is nearly always a boxed service duct or a stopcock cupboard in one corner, and it eats into the usable depth of the run. Deck access or a single narrow staircase with tight half-landings means long pieces get walked up on edge, and the landing turn is checked before we commit. The slow parts are slow for a reason.
Housings and integrated appliances are set out for a 38mm laminate top, so dropping to 20mm or 30mm stone changes the clearances and needs checking before anything is cut. The template visit is booked once the units are genuinely in, not when they are nearly in. The room as it is, not as it was drawn.
Access. The Aldgate gyratory and its approaches are red route with no stopping, so everything goes through a basement service yard with a height barrier or a booked bay at the building entrance. Tower blocks run full contractor control - induction, insurance, permit to work, booked goods lift and a lift protection kit fitted before the first piece moves.
At a glance
- Borough
- City of London
- Postcodes
- EC3N, EC3A
- Covered from
- Essex patch
- Lead time
- 3–7 working days from template
There is nothing to visit in Aldgate. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.
Services
What we do in Aldgate
Six services, ordered by what Aldgate's housing stock actually asks for most.
Nearby
We also work around Aldgate
Questions
Working in Aldgate
Do you fit kitchen worktops in Aldgate?
Yes. Newer towers on the eastern edge give standard developer kitchens - a 3-3.4m run against the riser plus an island of about 2m, with an induction hob and a recirculating extract that fixes the hob position. Many of these are being upgraded from original laminate or composite to quartz within a few years of completion, so the job is a straight swap onto existing carcases. Where the bay sits some distance from the core, the carry across the car park is the longest leg of the day and gets boarded and lit. Waste is the part people forget: the old laminate or tired granite has to be walked back to the van and it does not get lighter. It is a full day at the kerb, not a delivery.
What kind of kitchens do you usually work on in Aldgate?
modern residential tower, office to residential conversion, 1980s-90s apartment block and mixed-use development over retail. Dot-and-dab plasterboard bellies at a taped internal angle, so the run picks up a few millimetres over the last 300mm and a plan-angle mitre will not close. The template records that corner as it is, so the mitre closes tight instead of being cut to a theoretical 90 degrees. No stone is ever cut from a plan.
Is access difficult in Aldgate?
The Aldgate gyratory and its approaches are red route with no stopping, so everything goes through a basement service yard with a height barrier or a booked bay at the building entrance. Tower blocks run full contractor control - induction, insurance, permit to work, booked goods lift and a lift protection kit fitted before the first piece moves. A car that takes 2.4m on the diagonal will not take a three-metre worktop however it is stood, and there is no trimming it on the landing. A template taken without walking the route produces a drawing that cuts beautifully and will not go in. The laser records it along with everything else.
What do you get asked for most in Aldgate?
Worktop replacement, worktop installation and worktop templating, in that order. Housings and integrated appliances are set out for a 38mm laminate top, so dropping to 20mm or 30mm stone changes the clearances and needs checking before anything is cut. The template visit is booked once the units are genuinely in, not when they are nearly in. The room as it is, not as it was drawn. Straight swaps onto existing carcases still need the carcase levels checked, because developer units settle and a 3m top will rock on units that were only shimmed once.
What decides the price of a worktop in Aldgate?
The catch with a galley is that both runs are seen end-on from the doorway, so any difference in overhang between the two reads immediately. Joins are pulled with suction clamps and finished flush, then colour-matched, which is the last thing done rather than the first. Dry-lay first, always. Anything that has to stay accessible, a stopcock, a gas meter, a riser panel, is marked on the template so the stone is cut around it instead of over it. The back edge is eased in progressively rather than offered up once and forced. It is the slow part of the day and it should be. Material runs from £110 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines rather than rolled into one figure.
Do you work in flats and leasehold properties in Aldgate?
A street with houses in single occupation next to the same houses cut into flats produces two completely different jobs from the same elevation. The templater needs the sink, tap and hob on site, and a Belfast sink installed at its final height. No stone is cut from a plan. Tell us the building when you book and the lift, the stair turn and any freeholder notice get built into the day rather than found on it.
Next step
Get your Aldgate kitchen priced
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.