The housing stock
What we are usually working with in Queenhithe
The lift car, the loading bay and the building manager decide the piece sizes here, not the slab. The fitting day is planned backwards from all of it, before the first piece comes off the van. The whole run is dry-fitted before any adhesive is opened.
Old inset hob and sink cut-outs never match modern appliance dimensions, so confirm the new appliances before templating or you will be cutting an oversized hole to hide an old one. Upper Thames Street runs below and alongside as a fast dual carriageway with no stopping whatsoever, so access is via the raised riverside walk and a building's own service entrance off a side street. The walk from the nearest permitted stopping point to the flat door can be long and partly on a raised deck with steps, so a route survey matters more than the lift dimensions.
Open-plan living makes the kitchen furniture rather than utility, so the island and the run behind it are nested off the same area of slab. Silicone goes on last and the surface is left clean, since there is nothing else in a finished flat to hide behind. Levelled first, then set, then sealed.
What we are cutting for, here, is riverside apartment block, 1980s-90s development on the north bank, warehouse-style conversion and modern flat above commercial floors. The wall build-up is different in each, and the scribe follows the wall.
There is nothing to visit in Queenhithe. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.