Getting stone into the room
The side passage is the measurement that matters, because a piece has to be carried flat down it and then turned in at the back door, and the turn is always tighter than the passage. It sets the crew: two fitters where the route is straightforward, four where it is not. Boards go down wherever a loaded trolley has to run.
The distance from the standing to the actual kitchen door is the number that counts, since plenty of drives finish at a side gate and a garden path. Getting the waste off site is the same question as getting the stone on site, because both go through the same gap on the same day. A one-hour window will not hold a two-way job.